IDENTIFIKASI PENYEBAB KETERLAMBATAN PROYEK CHINA TOWN MALL JAKARTA MENGGUNAKAN METODE FAULT TREE ANALYSIS (FTA)

IVANTO, DENNY (2020) IDENTIFIKASI PENYEBAB KETERLAMBATAN PROYEK CHINA TOWN MALL JAKARTA MENGGUNAKAN METODE FAULT TREE ANALYSIS (FTA). S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
1. Cover.pdf

Download (34kB) | Preview
[img]
Preview
Text (ABSTRAK)
2. Abstrak.pdf

Download (191kB) | Preview
[img]
Preview
Text (LEMBAR PERNYATAAN)
3. Lembar Pernyataan.pdf

Download (234kB) | Preview
[img]
Preview
Text (LEMBAR PENGESAHAN)
4. Lembar Pengesahan.pdf

Download (240kB) | Preview
[img]
Preview
Text (KATA PENGANTAR)
5. Kata Pengantar.pdf

Download (228kB) | Preview
[img]
Preview
Text (DAFTAR ISI)
6. Daftar Isi.pdf

Download (194kB) | Preview
[img]
Preview
Text (DAFTAR LAMPIRAN)
9. Daftar Lampiran.pdf

Download (188kB) | Preview
[img]
Preview
Text (DAFTAR TABEL)
7. Daftar Tabel.pdf

Download (189kB) | Preview
[img]
Preview
Text (DAFTAR GAMBAR)
8. Daftar Gambar.pdf

Download (189kB) | Preview
[img] Text (BAB I)
10. Bab 1.pdf
Restricted to Registered users only

Download (260kB)
[img] Text (BAB III)
12. Bab 3.pdf
Restricted to Registered users only

Download (302kB)
[img] Text (BAB II)
11. Bab 2.pdf
Restricted to Registered users only

Download (480kB)
[img] Text (BAB IV)
13. Bab 4.pdf
Restricted to Registered users only

Download (758kB)
[img] Text (BAB V)
14. Bab 5.pdf
Restricted to Registered users only

Download (206kB)
[img] Text (DAFTAR PUSTAKA)
15. Daftar Pustaka.pdf
Restricted to Registered users only

Download (252kB)
[img] Text (LAMPIRAN)
16. Lampiran.pdf
Restricted to Registered users only

Download (839kB)

Abstract

Pelaksanaan pembangunan Proyek China Town Mall merupakan salah satu proyek yang dikerjakan oleh PT. Tecotama. Ditargetkan yang seharusnya selesai dalam 1 tahun 10 bulan sesuai kontrak yang diberikan ternyata dalam pelaksanaannya pekerjaan proyek tersebut mengalami keterlambatan yang selesai dalam waktu 2 Tahun 10 Bulan. Dimana pekerjaan tersebut di mulai pada bulan januari 2016 dan seharusnya masa proyek ini selesai pada bulan oktober 2017 tetapi menjadi selesai pada bulan oktober tahun 2018. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor penyebab keterlambatan dari pekerjaan yang saling berhubungan. Metode yang digunakan dalam penelitian ini adalah Fault Tree Analysis (FTA) Pengumpulan data dilakukan secara langsung dari pelaksanaan proyek dengan wawancara kepada Site Manager. Dari hasil penelitian didapatkan 3 item pekerjaan yang mengalami keterlambatan yaitu Pengadaan Material, Pekerjaan Instalasi Ducting, dan Pekerjaan Instalasi Pipa. Kata kunci : FTA, Keterlambatan, Proyek Konstruksi China Town Mall is one of the projects undertaken by PT. Tecotama. Transferred to be completed within 1 year 10 months according to the contract awarded for the delayed project implementation which is completed within 2 Years 10 Months. Where this work began in January 2016 and the future of this project will be completed in October 2017 will be completed in October 2018. This study aims to improve the factors that cause delays from interrelated work. The method used in this research is Fault Tree Analysis (FTA). Data collection is carried out directly from the implementation of the project by interviewing the Site Manager. From the research results obtained 3 work items which are postponed namely Procurement Materials, Ducting Installation Work, and Pipe Installation Work. Keywords: FTA, Delay, Project Contruction

Item Type: Thesis (S1)
Call Number CD: FE/MJ. 20 344
NIM/NIDN Creators: 43115110392
Additional Information: FTA, Keterlambatan, Proyek Konstruksi
Subjects: 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 657 Accounting/Akuntansi > 657.9 Accounting for Specific Kinds of Organizations/Akuntansi untuk Jenis Organisasi Tertentu > 657.95 Corporations/Perusahaan
900 Geography and History/Sejarah, Geografi dan Disiplin Ilmu yang Berkaitan > 920 Biography, Obituary/Biografi, Obituari > 929 Genealogy, names, insignia > 929.9 Forms of Identifications/Bentuk-bentuk Identifikasi
Divisions: Fakultas Ekonomi dan Bisnis > Manajemen
Depositing User: Dede Muksin Lubis
Date Deposited: 06 Jan 2022 07:46
Last Modified: 13 Apr 2022 07:48
URI: http://repository.mercubuana.ac.id/id/eprint/53724

Actions (login required)

View Item View Item