MAULANA, IHSAN (2020) ANALISIS KELAYAKAN INVESTASI PROYEK PEMBANGUNAN POWER PLANT 25 MW PADA PABRIK KERTAS DI KARAWANG DI TINJAU ASPEK KEUANGAN, TEKNOLOGI DAN LINGKUNGAN. S2 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
1. Cover.pdf Download (646kB) | Preview |
|
Text (BAB I)
2. Bab I.pdf Restricted to Registered users only Download (375kB) |
||
Text (BAB II)
3. Bab II.pdf Restricted to Registered users only Download (454kB) |
||
Text (BAB III)
4. Bab III.pdf Restricted to Registered users only Download (140kB) |
||
Text (BAB IV)
5. Bab IV.pdf Restricted to Registered users only Download (673kB) |
||
Text (BAB V)
6. Bab V.pdf Restricted to Registered users only Download (122kB) |
||
Text (DAFTAR PUSTAKA)
7. Daftar Pustaka.pdf Restricted to Registered users only Download (165kB) |
||
Text (LAMPIRAN)
8. LAMPIRAN.pdf Restricted to Registered users only Download (1MB) |
Abstract
Electrical energy is a source of energy needed by industry. This study aims to analyze the feasibility of investing in the construction of a pulp and paper industry power plant in Karawang. Research in terms of aspects of technology, environmental impacts are compared in the application of old technology and new technology. Financial aspects with the capital budgeting method. From the results of studies in the aspects of Technology 29.66 Tons / h Coal can produce 25 MW of electricity and supply steam for paper production. while the old Boiler 28.6 Ton / h only supplies steam for paper production, so that the Power Plant Project is more efficient than production costs and multifunctional technology. From an environmental aspect the technology used for fly ash is using ESP. ESP can not only reduce Sox, Nox, Total Particulate can also eliminate HG and fine dust so that it is safe for the environment and financial aspects of calculations with a payback period showing 3.62 years or 3 years 7 1/2 months, by using a Discounted payback return period is 4.21 Year or 4 years 2.5 months, using a Net Present Value (NPV) of $ 32,513,596.83, using the Internal Rate of Return (IRR) method is 36.88%, and using the Profitability Index (PI) method is 2.29. after comparing with the eligibility criteria, it can be concluded that this project is feasible to be implemented. Key word : power plant, pulp and paper, ESP,capital budgeting Energi listrik merupakan sumber energi yang di perlukan oleh industri. Penelitian ini bertujuan menganalisis kelayakan investasi pada pembangunan pembangkit listrik industri pulp and paper di karawang. Penelitian ditinjau dari aspek Teknologi, dampak lingkungan di bandingkan dalam penerapan teknologi lama dan teknologi baru. Aspek keuangan dengan metode capital budgeting. Dari hasil studi dalam aspek Teknologi 29.66 Ton/h Batu bara dapat menghasilkan 25 MW listrik dan supply steam untuk produksi kertas. sedangkan Boiler lama 28.6 Ton/h hanya mensupply steam untuk produksi kertas, sehingga Proyek Pembangkit listrik lebih efisien dari biaya produksi dan multifungsi teknologi. Dari aspek lingkungan teknologi di pakai untuk fly ash adalah mengunakan ESP. ESP tidak hanya dapat menurunkan Sox, Nox, Total Particulate dapat juga menghilangkan HG dan debu halus sehingga aman terhadap lingkungan dan Aspek keuangan dari perhitungan dengan payback period menunjukan 3.62 tahun atau 3 tahun 7 1/2 bulan, dengan mengunakan Discounted payback period pengembalian adalah 4.21 Tahun atau 4 tahun 2.5 bulan, dengan mengunakan Net Present Value (NPV) sebesar $ 32,513,596.83, mengunakan metode Internal Rate of Return (IRR) adalah 36.88%, dan mengunakan metode Profitability Index (PI) adalah 2.29. setelah dibandingkan dengan kriteria kelayakan maka dapat disimpulkan proyek ini layak untuk dilaksanakan. Kata Kunci : Pembangkit Listrik, ESP, Capital Budgeting
Actions (login required)
View Item |