SYAFRIANI, SYAFRIANI (2019) IDENTIFIKASI FAKTOR - FAKTOR PENYEBAB PEKERJAAN ULANG (REWORK) PADA PROYEK KONSTRUKSI (Study Kasus: Mangkulihur City Jl. Gatot Subroto, Jakarta). S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01. HALAMAN COVER.pdf Download (123kB) | Preview |
|
|
Text (ABSTRAK)
02. ABSTRAK.pdf Download (105kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
03. SURAT PERNYATAAN.pdf Download (163kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
04. LEMBAR PENGESAHAN.pdf Download (178kB) | Preview |
|
|
Text (KATA PENGANTAR)
05. KATA PENGANTAR.pdf Download (165kB) | Preview |
|
|
Text (DAFTAR ISI)
06. DAFTAR ISI.pdf Download (46kB) | Preview |
|
|
Text (DAFTAR TABEL)
07. DAFTAR TABEL.pdf Download (30kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
08. DAFTAR GAMBAR.pdf Download (27kB) | Preview |
|
Text (BAB I)
09. BAB I.pdf Restricted to Registered users only Download (167kB) |
||
Text (BAB II)
10. BAB II.pdf Restricted to Registered users only Download (278kB) |
||
Text (BAB III)
11. BAB III.pdf Restricted to Registered users only Download (303kB) |
||
Text (BAB IV)
12. BAB IV.pdf Restricted to Registered users only Download (647kB) |
||
Text (BAB V)
13. BAB V.pdf Restricted to Registered users only Download (105kB) |
||
Text (DAFTAR PUSTAKA)
14. DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (27kB) |
||
Text (LAMPIRAN)
15. LAMPIRAN.pdf Restricted to Registered users only Download (651kB) |
Abstract
Reworking is one of the main contributors to the cost overruns and the results of construction construction, can make changes to all parties, especially the Contractor and Owner itself. In this project, there are a lot of work items that are recharged that carry out the contract price of up to ± 25.09% and exceed the limit of up to ± 14 months. The purpose of this study was to determine the main factors of re-cause. The data collection method was carried out by distributing questionnaires from the beginning to 5 people as experts who were the deepest parties in mobilizing development projects in the city of Mangkuluhur. The second stage of Konsel was distributed to 60 respondents, but 39 returned as samples. Data processing is carried out with the help of the SPSS program. The results of this study indicate that the main factor that is most often realized is the design with a percentage of 3.46% of 39 samples. Keywords: Rework, Rework, Construction Project, Main , Mangkuluhur City Rework merupakan salah satu kontributor utama penyebab terjadi pembengkakan biaya dan keterlambatan proyek konstruksi, sehingga dapat mengakibatkan kerugian bagi semua pihak terutama Kontraktor maupun Owner itu sendiri. Pada proyek ini banyak sekali item-item pekerjaan yang di ulang-ulang yang mengakibatkan nilai kontrak meningkat hingga ±25,09% dan mengalami keterlambatan hingga ±14 bulan. Tujuan dari penelitian ini adalah untuk mengetahui Faktor-faktor utama penyebab rework. Metode pengumpulan data dilakukan dengan penyebaran kuisioner tahap awal kepada 5 orang sebagai pakar yang merupakan pihak paling berpengaruh dalam jalannya proyek konstruksi di mangkuluhur city. Kuesioner tahap ke-2 dibagikan kepada 60 responden, tetapi yang kembali sebanyak 39 kuesioner sebagai sample. Pengolahan data dilakukan dengan bantuan program SPSS. Hasil penelitian ini menunjukkan bahwa faktor utama penyebab rework paling sering terjadi adalah sering terjadi perubahan design dengan persentase 3.46% dari 39 sample. Kata kunci : Pekerjaan Ulang, Rework, Proyek Konstruksi, Mangkuluhur City