ANALISIS WAKTU DAN BIAYA PELAKSANAAN KONSTRUKSI PEMASANGAN (ERECTION) MENGGUNAKAN MODEL U-SHAPE GIRDER PADA PROYEK LIGHT RAIL TRANSIT (LRT)-JABODEBEK LINTAS LAYANAN TAMAN MINI - CIBUBUR

NUSANTARA, BINTANG PUTRA (2018) ANALISIS WAKTU DAN BIAYA PELAKSANAAN KONSTRUKSI PEMASANGAN (ERECTION) MENGGUNAKAN MODEL U-SHAPE GIRDER PADA PROYEK LIGHT RAIL TRANSIT (LRT)-JABODEBEK LINTAS LAYANAN TAMAN MINI - CIBUBUR. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
1. Halaman Judul.pdf

Download (125kB) | Preview
[img]
Preview
Text (ABSTRAK)
2. Abstrak.pdf

Download (56kB) | Preview
[img]
Preview
Text (LEMBAR PERNYATAAN)
3. Lembar Pernyataan.pdf

Download (138kB) | Preview
[img]
Preview
Text (LEMBAR PENGESAHAN)
4. Lembar Pengesahan.pdf

Download (160kB) | Preview
[img]
Preview
Text (KATA PENGANTAR)
5. Kata Pengantar.pdf

Download (55kB) | Preview
[img]
Preview
Text (DAFTAR ISI)
6. Daftar Isi.pdf

Download (62kB) | Preview
[img]
Preview
Text (DAFTAR TABEL)
7. Daftar Tabel.pdf

Download (56kB) | Preview
[img]
Preview
Text (DAFTAR GAMBAR)
8. Daftar Gambar.pdf

Download (66kB) | Preview
[img]
Preview
Text (DAFTAR LAMPIRAN)
9. Daftar Lampiran.pdf

Download (52kB) | Preview
[img] Text (BAB I)
10. Bab 1 (Pendahuluan).pdf
Restricted to Registered users only

Download (76kB)
[img] Text (BAB II)
11. Bab 2 (Tinjauan Pustaka).pdf
Restricted to Registered users only

Download (879kB)
[img] Text (BAB III)
12. Bab 3 (Metodologi Penelitian).pdf
Restricted to Registered users only

Download (402kB)
[img] Text (BAB IV)
13. Bab 4 (Hasil dan Analisis).pdf
Restricted to Registered users only

Download (786kB)
[img] Text (BAB V)
14. Bab 5 (Penutup).pdf
Restricted to Registered users only

Download (54kB)
[img] Text (DAFTAR PUSTAKA)
15. Daftar Pustaka.pdf
Restricted to Registered users only

Download (53kB)
[img] Text (LAMPIRAN)
16. Lampiran.pdf
Restricted to Registered users only

Download (8MB)

Abstract

(Erection) Menggunakan Model U-Shape Girder Pada Proyek Light Rail Transit (LRT) – Jabodebek Lintas Layanan Taman Mini – Cibubur Mobilitas penduduk yang tinggi merupakan salah satu penyebab kemacetan di Jakarta. Salah satu upaya pemerintah dalam mengatasi kemacetan adalah dengan menggagas modernisasi transportasi massal terutama berbasis rel yaitu pembangunan Light Rail Transit (LRT) Jabodebek. Pada proses pembangunannya, LRT yang pertama kali dibangun di Indonesia oleh PT Adhi Karya (Persero) Tbk menggunakan struktur U-Shape Girder. U-Shape Girder merupakan sebuah konsep viaduct yang relatif baru dalam dunia perkonstruksian di Indonesia yang digunakan dalam pembangunan proyek LRT Jabodebek. Penggunaan U-Shape Girder P=30 m, L=4.6m, T=1.75m, dengan bentuknya yang langsing dan tipis, memberikan keuntungan dapat mengurangi dimensi pier head yang diperlukan, dan produksi pier head. Hasil analisis dapat dapat diperoleh simpulan metode konstruksi pemasangan (erection) menggunakan model U-Shape Girder adalah menggunakan alat berat 2 crawel crane dengan kapasitas 250 T berjalan cukup baik dan sudah sesuai standar (SOP). Schedule waktu pelaksanaan U-Shape Girder P.138 - P.133 pada proyek LRT Jabodebek Lintas Layanan Taman Mini – Cibubur adalah 23 hari kerja dan untuk pekerjaan (erection) pemasangan U-Shape Girder dengan menggunakan 2 alat crawler crane 250 T dibutuhkan waktu 5 hari kerja. Rencana anggaran biaya pemasangan (erection) U-Shape Girder P.138 - P.133 pada proyek LRT Jabodebek Lintas Layanan Taman Mini - Cibubur adalah sebesar Rp. 1.903.701.476,80 dengan jumlah U-Shape Girder 575,20 m³ atau 10 unit per bentang 30 m. Rekapitulasi Biaya menggunakan metode struktur dari pengadaan, pengiriman, dan pemasangan (erection) U-Shape Girder P.138 – P.133/ m³ adalah Rp. 8.314.614.014,08. Kata kunci : LRT Jabodebek, precast U-Shape Girder, metode erection girder, waktu erection, biaya erection. Abstract Title : Analysis of Time and Cost of Installation Construction (Erection) Using the U-Shape Girder Model On Light Rail Transit (LRT) Project Jabodebek Service Lintas Taman Mini – Cibubur. High population mobility is one of the causes of congestion in Jakarta. One of the government's efforts to overcome the congestion is to initiate the modernization of mass transportation, especially based on rail, namely Light Rail Transit (LRT) construction of Jabodebek. In the development process, LRT which was first built in Indonesia by PT Adhi Karya (Persero) Tbk using U-Shape Girder structure. U-Shape Girder is a relatively new concept of viaduct in the world of construction in Indonesia used in the construction of the Jabodebek LRT project. The use of U-Shape Girder P = 30 m, L = 4.6m, T = 1.75m, with its slim and thin shape, gives the advantage of reducing the required pier head dimensions, and the production of pier head. The results of the analysis can be obtained by the conclusion of the construction method of erection using the U-Shape Girder model is to use 2 crawel cranes with 250 T capacity running well and standard (SOP). Schedule of U-Shape Girder P.138 - P.133 for LRT Jabodebek Lintas Taman Mini - Cibubur Service is 23 working days and for erection work of U-Shape Girder installation using 2 250 T crawler crane tool takes 5 working days. The budget plan of U-Shape Girder P.138 - P.133 for the LRT project of Jabodebek Lintas Taman Mini - Cibubur Service is Rp. 1.903.701.476,80 with the number of U-Shape Girder 575,20 m³ or 10 units per span 30 m. Cost Recapitulation using structural methods of procurement, delivery and installation (erection) U-Shape Girder P.138 - P.133 / m³ is Rp. 8.314.614.014,08. Keyword : LRT Jabodebek, precast U-Shape Girder, methods erection girder, erection time, erection cost.

Item Type: Thesis (S1)
Call Number CD: FT/SIP. 19 051
Call Number: ST/11/18/124
NIM/NIDN Creators: 41116120217
Uncontrolled Keywords: LRT Jabodebek, precast U-Shape Girder, methods erection girder, erection time, erection cost.
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.1 Plans and Drawings Construction/Rancangan dan Menggambar Konstruksi Bangunan
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.3 Construction Specifications/Spesifikasi Konstruksi Bangunan
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 693 Construction In Specific Types of Materials and For Specific Purposes/Konstruksi Dalam Jenis Bahan Khusus dan Untuk Tujuan Khusus > 693.8 Construction for Specific Purposes/Konstruksi Bangunan untuk Tujuan Tertentu
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Dede Muksin Lubis
Date Deposited: 15 Nov 2018 01:44
Last Modified: 08 Sep 2022 06:29
URI: http://repository.mercubuana.ac.id/id/eprint/45589

Actions (login required)

View Item View Item