ARIFIN, MUHAMMAD ZAENAL (2016) ANALISIS WAKTU DAN BIAYA METODE PEKERJAAN PIER HEAD CAST IN SITU DAN PIER HEAD PRECAST PADA PROYEK INFRASTRUCTURE FLY OVER. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
Hal Cover.pdf Download (423kB) | Preview |
|
|
Text (ABSTRAK)
Abstrak.doc.pdf Download (41kB) | Preview |
|
Text (BAB I)
BAB I.pdf Restricted to Registered users only Download (384kB) |
||
Text (BAB II)
BAB II.pdf Restricted to Registered users only Download (478kB) |
||
Text (BAB III)
BAB III.pdf Restricted to Registered users only Download (397kB) |
||
Text (BAB IV)
Bab IV.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
BAB V.pdf Restricted to Registered users only Download (203kB) |
||
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf Restricted to Registered users only Download (71kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 16 022 |
NIM/NIDN Creators: | 41111120046 |
Uncontrolled Keywords: | Pier Head, Cast In Situ, Precast, Biaya, Waktu |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 30 Jun 2016 11:12 |
Last Modified: | 28 Jul 2022 13:22 |
URI: | http://repository.mercubuana.ac.id/id/eprint/4040 |
Actions (login required)
View Item |