Penetapan standar waktu produksi berdasarkan pengukuran kerja pada PT.Ledin

Rivany, Syahrul Bahtiar (2006) Penetapan standar waktu produksi berdasarkan pengukuran kerja pada PT.Ledin. S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (Cover)
Cover.pdf

Download (232kB) | Preview
[img] Text (Bab 1)
Bab 1.pdf
Restricted to Registered users only

Download (209kB)
[img] Text (Bab 2)
Bab 2.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (Bab 3)
Bab 3.pdf
Restricted to Registered users only

Download (416kB)
[img] Text (Bab 4)
Bab 4.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (Bab 5)
Bab 5.pdf
Restricted to Registered users only

Download (164kB)
[img] Text (Daftar Pustaka dan Lampiran)
Daftar Pustaka dan Lampiran.pdf
Restricted to Registered users only

Download (210kB)
Item Type: Thesis (S1)
Call Number CD: LT.III
Call Number: SE/06/01 BAH p
NIM/NIDN Creators: 03101-242
Uncontrolled Keywords: PENETAPAN STANDAR WAKTU PRODUKSI
Divisions: Fakultas Ekonomi dan Bisnis > Manajemen
Depositing User: Admin Perpus UMB
Date Deposited: 10 Nov 2006 11:03
Last Modified: 06 Jul 2017 03:18
URI: http://repository.mercubuana.ac.id/id/eprint/36894

Actions (login required)

View Item View Item