TOPIK, MUHAMMAD (2013) ANALISA HARGA PROSES PEMBUATAN SPARE PARTS MESIN CURING TUBE (STEAM JOINT STAND FOR BENDED TR). S1 thesis, Universitas Mercu Buana Jakarta.
| 
 | Text (HAL COVER) cover.pdf Download (388kB) | Preview | |
| ![[img]](https://repository.mercubuana.ac.id/style/images/fileicons/text.png) | Text (BAB I) BAB I.pdf Restricted to Registered users only Download (123kB) | |
| ![[img]](https://repository.mercubuana.ac.id/style/images/fileicons/text.png) | Text (BAB II) BAB II.pdf Restricted to Registered users only Download (261kB) | |
| ![[img]](https://repository.mercubuana.ac.id/style/images/fileicons/text.png) | Text (BAB III) BAB III.pdf Restricted to Registered users only Download (413kB) | |
| ![[img]](https://repository.mercubuana.ac.id/style/images/fileicons/text.png) | Text (BAB IV) BAB IV.pdf Restricted to Registered users only Download (125kB) | |
| ![[img]](https://repository.mercubuana.ac.id/style/images/fileicons/text.png) | Text (DAFTAR PUSTAKA) daftar pustaka.pdf Restricted to Registered users only Download (49kB) | 
Abstract
ANALISA HARGA PROSES PEMBUATAN SPARE PARTS MESIN CURING TUBE (STEAM JOINT STAND FOR BENDED TR)
| Item Type: | Thesis (S1) | 
|---|---|
| Call Number CD: | KP/MSN. 13 036 | 
| Call Number: | KP/13/13/036 | 
| NIM/NIDN Creators: | 41308010027 | 
| Uncontrolled Keywords: | ANALISA HARGA PROSES PEMBUATAN SPARE PARTS MESIN CURING TUBE (STEAM JOINT STAND FOR BENDED TR) | 
| Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 621 Applied Physics/Fisika terapan > 621.8 Machine Engineering, Machinery/Teknik Mesin | 
| Divisions: | Fakultas Teknik > Teknik Mesin | 
| Depositing User: | Admin Perpus UMB | 
| Date Deposited: | 07 Feb 2013 15:49 | 
| Last Modified: | 13 Jun 2025 02:56 | 
| URI: | http://repository.mercubuana.ac.id/id/eprint/35608 | 
Actions (login required)
|  | View Item | 
 
        