ANALISA HARGA PROSES PEMBUATAN SPARE PARTS MESIN CURING TUBE (STEAM JOINT STAND FOR BENDED TR)

TOPIK, MUHAMMAD (2012) ANALISA HARGA PROSES PEMBUATAN SPARE PARTS MESIN CURING TUBE (STEAM JOINT STAND FOR BENDED TR). S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
cover.pdf

Download (388kB) | Preview
[img] Text (BAB I)
BAB I.pdf
Restricted to Registered users only

Download (123kB)
[img] Text (BAB II)
BAB II.pdf
Restricted to Registered users only

Download (261kB)
[img] Text (BAB III)
BAB III.pdf
Restricted to Registered users only

Download (413kB)
[img] Text (BAB IV)
BAB IV.pdf
Restricted to Registered users only

Download (125kB)
[img] Text (DAFTAR PUSTAKA)
daftar pustaka.pdf
Restricted to Registered users only

Download (49kB)

Abstract

ANALISA HARGA PROSES PEMBUATAN SPARE PARTS MESIN CURING TUBE (STEAM JOINT STAND FOR BENDED TR)

Item Type: Thesis (S1)
Call Number CD: KP/MSN. 13 036
Call Number: KP/13/13/036
NIM/NIDN Creators: 41308010027
Uncontrolled Keywords: ANALISA HARGA PROSES PEMBUATAN SPARE PARTS MESIN CURING TUBE (STEAM JOINT STAND FOR BENDED TR)
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 621 Applied Physics/Fisika terapan > 621.8 Machine Engineering, Machinery/Teknik Mesin
Divisions: Fakultas Teknik > Teknik Mesin
Depositing User: Admin Perpus UMB
Date Deposited: 07 Feb 2013 15:49
Last Modified: 15 Mar 2025 04:02
URI: http://repository.mercubuana.ac.id/id/eprint/35608

Actions (login required)

View Item View Item