ANALISIS PERBANDINGAN PONDASI BORE PILE DENGAN INNERBORE SYSTEM DITINJAU DARI SEGI KEKUATAN METODE PELAKSANAAN DAN BIAYA PADA PEMBANGUNAN RS. ST. CAROLUS

SARI, PRAMESTI ANDALAS (2017) ANALISIS PERBANDINGAN PONDASI BORE PILE DENGAN INNERBORE SYSTEM DITINJAU DARI SEGI KEKUATAN METODE PELAKSANAAN DAN BIAYA PADA PEMBANGUNAN RS. ST. CAROLUS. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
1. COVER.pdf

Download (86kB) | Preview
[img]
Preview
Text (ABSTRAK)
2. ABSTRAK.pdf

Download (27kB) | Preview
[img] Text (BAB I)
3. BAB I.pdf
Restricted to Registered users only

Download (40kB)
[img] Text (BAB II)
4. BAB II.pdf
Restricted to Registered users only

Download (514kB)
[img] Text (BAB III)
5. BAB III.pdf
Restricted to Registered users only

Download (93kB)
[img] Text (BAB IV)
6. BAB IV.pdf
Restricted to Registered users only

Download (768kB)
[img] Text (BAB V)
7. BAB V.pdf
Restricted to Registered users only

Download (22kB)
[img] Text (DAFTAR PUSTAKA DAN LAMPIRAN)
8. DAFTAR PUSTAKA & LAMPIRAN.pdf
Restricted to Registered users only

Download (169kB)

Abstract

Struktur gedung terdiri dari struktur bawah dan struktur atas. Struktur bawah terdari pondasi, pile cap, dan dinding basement. Pondasi yang berfungsi meneruskan beban yang ditopang oleh beratnya sendiri kedalam tanah menurut Bowles (1998), tidak lepas dari permasalahan suatu proyek konstruksi. Jenis-jenis pondasi yang ada sangat bayak sehingga dalam memilih jnis pondasi yang akan digunakan, pihak pengambil keputusan harus memperhitungkan kriteriakriteria yang ada. Tugas Akhir ini membahas pondasi pada gedung, yaitu pondasi bore pile dibandingkan dengan inner-bore. Perhitungan daya dukung pondasi inner bore adalah dengan mengunakan metode Nakabori Kakutei System (NAKS). Sedangkan daya dukung pondasi bore pile dihitung dengan perbandingan antara metode Meyerhoff dan Aoki and De'Alencar. Perbandingan biaya kedua pondasi meliputi perbandingan mobilisasi-demobilisasi & keamanan, Jasa pemancangan / Pengeboran, material dan distribusi. Pengambilan keputusan dalam penelitian ini menggunakan metode Analytical Hierarchy Process (AHP). Kekuatan (daya dukung) pondasi Inner bore untuk tiang tunggal pada kedalaman 21 m memunyai daya dukung sebesar 314 ton pada DB-I, 250 ton pada DB-II, 328 ton pada DB-III, dan 370 pada DB-IV . Sedangkan untuk pondasi bore pile pada kedalaman yang sama memunyai daya dukung sebesar 305 ton pada DB-I, 249 ton pada DB-II, 337 ton pada DB-III, dan 334 pada DB-IV. Dari segi metode pelaksanaan terdapat perbedaan yang mendasar. Yaitu pada pondasi bore pile pengeboran tanah dilakukan sebelum pengecoran untuk melubangi permukaan tanah yang akan dicor sedangkan pada pondasi inner bore pengeboran dilaksanakan bersamaan dengan pemancangan atau penetrasi tiang ke dalam tanah sehingga dapat menghemat durasi pekerjaan secara umum dan keseluruhan. Biaya pondasi inner bore sebesar Rp. 9.212.762.495,- sedang biaya pondasi bore pile sebesar Rp. 8.005.390.733 dimana terdapat selisih biaya antara pondasi inner bore dan bore pile sebesar Rp. 1.207.371.762 . Dari nilai tersebut maka pondasi bore pile lebih murah dibandingkan dengan pondasi inner bore. Penilaian pondasi efektif pada proyek RS.St. Carolus dengan mengunakan metode AHP didapatkan nilai bobot pondasi inner bore adalah 0,651 dan pondasi bore pile mendapatkan bobot 0,349. Sehingga pondasi inner bore dianggap sebagai pondasi yang lebih efektif digunakan pada proyek pondasi pembangunan gedung RS. St. Carolus.The structure of the building consists of bottom structure and the upper structure. Under the structure of terdari foundation, pile cap, and basement walls. The foundation that serves to continue the load which is supported by its own weight into the ground by Bowles (1998), can not be separated from the problem of a construction project. The types of existing foundation so stout that in choosing jnis foundation to be used, the decision maker must take into account existing criteria. This final project discusses the foundation of the building, which bore pile foundation than the inner-bore. The calculation of the carrying capacity of the foundation is to use the inner bore Nakabori method Kakutei System (naks). While the bore pile foundation bearing capacity is calculated by the comparison between the methods Meyerhoff and Aoki and De'Alencar. The cost comparison includes comparing the two foundations mobilizationdemobilization and security, erection Services / Drilling, material and distribution. Decision-making in this study using Analytical Hierarchy Process (AHP). Strength (carrying capacity) foundation Inner bore for single pole at a depth of 21 m carrying capacity of 314 tonnes on the DB-I, 250 tons in DB-II, 328 tons in DB-III, and 370 on the DB-IV. As for the bore pile foundation at the same depth memunyai carrying capacity of 305 tonnes on the DB-I, 249 tons in DB-II, 337 tons in DB-III, and 334 on the DB-IV. In terms of implementation methods there is a fundamental difference. Bore pile foundation drilling done before casting to pierce the soil surface to be casted on the foundation of inner bore while drilling carried out simultaneously with erection or penetration of the pile into the ground so as to save the duration of work in general and overall. Inner bore foundation cost Rp. 9,212,762,495, - were bore pile foundation cost Rp. 8005390733 where there is a difference in cost between the inner bore and bore foundation pile Rp. 1207371762. The value of the bore pile foundation is cheaper than the foundation of the inner bore. Rate effective on the foundation of the project RS.St. Carolus using the method of AHP obtained inner foundation bore the weight values are 0.651 and bore pile foundation gain weight 0,349. So that the inner bore foundation is regarded as the foundation of a more effective use of the project foundation hospital building. St. Carolus

Item Type: Thesis (S1)
Call Number CD: FT/SIP. 17 152
NIM/NIDN Creators: 41115310058
Uncontrolled Keywords: Pondasi, Bore-pile, Inner-bore, biaya, kekuatan, metode pelaksanaan, pengambilan keputusan, AHP
Subjects: 000 Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 020 Library and Information Sciences/Perpustakaan dan Ilmu Informasi > 022 Administration of The Physical Plant/Administrasi dan Fisik Perpustakaan > 022.3 Buildings/Bangunan
000 Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 060 General Organizations, Foundations, and Museology/Organisasi-organisasi Umum, dan Museologi > 069 Museology (Museum science)/Museologi > 069.2 Museum Management and Use of Physical Plant/Manajemen Museum > 069.22 Planning for Buildings/Merencanakan Bangunan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
700 Arts/Seni, Seni Rupa, Kesenian > 720 Architecture/Arsitektur > 721 Architectural Structure/Struktur Arsitektur > 721.1 Foundations/Pondasi
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Admin Perpus UMB
Date Deposited: 20 Mar 2017 12:32
Last Modified: 01 Apr 2024 03:32
URI: http://repository.mercubuana.ac.id/id/eprint/33585