PERANCANGAN ANALISA WAKTU DAN KEBUTUHAN UDARA SILINDER PADA SISTEM PNEUMATIK DI DALAM RUANG IRADIATOR

SLAMET, SLAMET (2017) PERANCANGAN ANALISA WAKTU DAN KEBUTUHAN UDARA SILINDER PADA SISTEM PNEUMATIK DI DALAM RUANG IRADIATOR. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
01.HAL COVER.pdf

Download (235kB) | Preview
[img] Text (BAB I)
02.BAB I.pdf
Restricted to Registered users only

Download (196kB)
[img] Text (BAB II)
03.BAB II.pdf
Restricted to Registered users only

Download (30kB)
[img] Text (BAB III)
04.BAB III.pdf
Restricted to Registered users only

Download (36kB)
[img] Text (BAB IV)
05.BAB IV.pdf
Restricted to Registered users only

Download (880kB)
[img] Text (BAB V)
06.BAB V.pdf
Restricted to Registered users only

Download (20kB)
[img] Text (DAFTAR PUSTAKA DAN LAMPIRAN)
07.DAFTAR PUSTAKA DAN LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB)

Abstract

PERANCANGAN ANALISA WAKTU DAN KEBUTUHAN UDARA SILINDER PADA SISTEM PNEUMATIK DI DALAM RUANG IRADIATOR

Item Type: Thesis (S1)
Call Number CD: KP/MSN. 16 015
NIM/NIDN Creators: 41313110094
Uncontrolled Keywords: WAKTU, KEBUTUHAN UDARA SILINDER, SISTEM PNEUMATIK, RUANG IRADIATOR
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 621 Applied Physics/Fisika terapan > 621.8 Machine Engineering, Machinery/Teknik Mesin
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.5 Estimates of Labor, Time, Materials/Prakiraan Biaya Tenaga Kerja, Waktu dan Bahan-bahan
Divisions: Fakultas Teknik > Teknik Mesin
Depositing User: Admin Perpus UMB
Date Deposited: 25 Jan 2017 11:19
Last Modified: 30 Jul 2024 07:48
URI: http://repository.mercubuana.ac.id/id/eprint/32326

Actions (login required)

View Item View Item