Zaenuri, Saeful (2010) Analisis perbandingan bahan dinding System Konvensional dengan system GRC ditinjau dari segi biaya dan waktu (Studi kasus proyek pembangunan gedung kantor pengawasan dan pelayanan Bea Cukai Type A2 Bogor). S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
cover.pdf Download (369kB) | Preview |
|
|
Text (ABSTRAK)
002Abstrak.pdf Download (79kB) | Preview |
|
Text (BAB I)
006Bab I.pdf Restricted to Registered users only Download (130kB) |
||
Text (BAB II)
007Bab II.pdf Restricted to Registered users only Download (179kB) |
||
Text (BAB III)
008Bab III.pdf Restricted to Registered users only Download (102kB) |
||
Text (BAB IV)
009Bab IV.pdf Restricted to Registered users only Download (179kB) |
||
Text (BAB V)
010Bab V.pdf Restricted to Registered users only Download (218kB) |
||
Text (BAB VI)
011Bab VI..pdf Restricted to Registered users only Download (264kB) |
||
Text (BAB VII)
012Bab VII Kesimpulan.pdf Restricted to Registered users only Download (87kB) |
||
Text (DAFTAR PUSTAKA)
daft pustaka.pdf Restricted to Registered users only Download (1MB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FTPD/SIP. 10 037 |
Call Number: | STSP/11/10/010 |
NIM/NIDN Creators: | 41106120011 |
Uncontrolled Keywords: | PERBANDINGAN BAHAN |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 07 May 2010 11:26 |
Last Modified: | 26 Sep 2022 03:40 |
URI: | http://repository.mercubuana.ac.id/id/eprint/24450 |
Actions (login required)
View Item |