Suherman, (2012) MANAJEMEN KLAIM PENAMBAHAN BIAYA BERDASARKAN KAIDAH FIDIC GENERAL CONDITIONS OF CONTRACT FOR CONSTRUCTION (STUDI KASUS PROYEK CIREBON SUPER BLOK CSB) Mall Cirebon. S1 thesis, Universitas Mercu Buana.
|
Text (TUGAS AKHIR FULL)
SKRIPSI FULL.pdf Restricted to Registered users only Download (2MB) |
| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | FTPD/SIP. 12 008 |
| Call Number: | STSP/11/12/008 |
| NIM/NIDN Creators: | 41106120039 |
| Uncontrolled Keywords: | pekerjaan tambah, klaim, kontrak |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 07 Mar 2012 13:25 |
| Last Modified: | 24 Dec 2025 02:27 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/20383 |
Actions (login required)
![]() |
View Item |
