KHOIRUNNISA, TUTY (2013) ANALISA SISTEM AKUNTANSI PENGELOLAAN KONTRAK KERJA PROYEK PERUSAHAAN (STUDI KASUS : PT. BINA REKACIPTA UTAMA). S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
1. Hal Cover(1).pdf Download (276kB) | Preview |
|
|
Text (ABSTRAK)
2. Abstrak.pdf Download (70kB) | Preview |
|
![]() |
Text (BAB 1)
3. Bab 1.pdf Restricted to Registered users only Download (84kB) |
|
![]() |
Text (BAB 2)
4. Bab 2.pdf Restricted to Registered users only Download (116kB) |
|
![]() |
Text (BAB 3)
5. Bab 3.pdf Restricted to Registered users only Download (103kB) |
|
![]() |
Text (BAB 4)
6. Bab 4.pdf Restricted to Registered users only Download (251kB) |
|
![]() |
Text (BAB 5)
7. Bab 5.pdf Restricted to Registered users only Download (72kB) |
|
![]() |
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
8. Hal Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (254kB) |
Abstract
The performance improvement of a company is to keep the company survive and keeps running. In running the performance of the improvement, the accounting system is made to be watched by a good system of an internal control. If the internal control is weak, then the accounting system will not run optimally. One way in order to improve the performance, PT. Bina Rekacipta Utama, did the internal control in the management of the project contract. Therefore, this study aims to know the mechanism of the accounting system project of the company management in PT. Bina Rekacipta Utama, and to determine the level of internal control systems and also determine the solutions and constraints on the internal control This study uses a discussion with the management. The result from this study is that the accounting system project contract management of a company is not completely perfect. For example, PT. Bina Rekacipta Utama did a project, but the contract is not been issued.
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FE/AK. 13 024 |
Call Number: | SE/32/13/024 |
NIM/NIDN Creators: | 43211110269 |
Uncontrolled Keywords: | ANALISA SISTEM AKUNTANSI PENGELOLAAN KONTRAK KERJA PROYEK PERUSAHAAN (STUDI KASUS : PT. BINA REKACIP |
Divisions: | Fakultas Ekonomi dan Bisnis > Akuntansi |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 10 Mar 2013 15:37 |
Last Modified: | 24 Sep 2025 01:47 |
URI: | http://repository.mercubuana.ac.id/id/eprint/15703 |
Actions (login required)
![]() |
View Item |