Riyadi, Novrian (2014) ANALISA PENGENDALIAN PERSEDIAAN BAHAN BAKU PADA PRODUKSI SPARE PART LEVER CABLE DENGAN METODE MRP (Studi Kasus Pada PT Kyoda Mas Mulia). S1 thesis, Universitas Mercu Buana.
Text (HAL COVER)
Cover.pdf.crdownload Download (374kB) |
|
Text (BAB I)
BAB I.pdf.crdownload Restricted to Registered users only Download (254kB) |
|
Text (BAB II)
BAB II.pdf.crdownload Restricted to Registered users only Download (159kB) |
|
Text (BAB III)
BAB III.pdf.crdownload Restricted to Registered users only Download (640kB) |
|
Text (BAB IV)
BAB IV.pdf.crdownload Restricted to Registered users only Download (929kB) |
|
Text (BAB V)
BAB V.pdf.crdownload Restricted to Registered users only Download (169kB) |
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf.crdownload Restricted to Registered users only Download (217kB) |
Abstract
ANALISA PENGENDALIAN PERSEDIAAN BAHAN BAKU PADA PRODUKSI SPARE PART LEVER CABLE DENGAN METODE MRP
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | KP/IND. 14 006 |
NIM/NIDN Creators: | 41610010028 |
Uncontrolled Keywords: | ANALISA PENGENDALIAN PERSEDIAAN BAHAN BAKU PADA PRODUKSI SPARE PART LEVER CABLE DENGAN METODE (Studi |
Subjects: | 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.7 Management of Supplies/Manajemen Persediaan 600 Technology/Teknologi > 670 Manufacturing/Manufaktur, Pabrik-pabrik 600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.5 Estimates of Labor, Time, Materials/Prakiraan Biaya Tenaga Kerja, Waktu dan Bahan-bahan |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 07 Aug 2014 13:54 |
Last Modified: | 10 Dec 2024 02:26 |
URI: | http://repository.mercubuana.ac.id/id/eprint/10903 |
Actions (login required)
View Item |