Items where Subject is "500 Natural Science and Mathematics/Ilmu-ilmu Alam dan Matematika > 520 Comprehensive Works of Astronomy/Karya Komprehensif tentang Astronomi > 529 Chronology/Waktu Kronologis > 529.2 Intervals of Time/Interval Waktu"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: C | D | F | H | R | S
Number of items at this level: 7.

C

CERIENOVINKAI, ZIEYA (2020) USULAN PERBAIKAN PROSES MIXING POWDER UNTUK MENGURANGI WASTE DAN LEAD TIME MENGGUNAKAN METODE VALUE STREAM MAPPING DI PT. XYZ. S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

D

DERMAWAN, BUDI (2019) PERANCANGAN SISTEM KANBAN UNTUK MENGURANGI WAKTU TUNGGU PENYEDIAAN MATERIAL DI GUDANG PADA PT. SINAR METRINDO PERKASA. S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

F

FITRIA, FERA (2019) PENERAPAN WAKTU BAKU PADA PROSES MESIN PRESS DAN FLANGGING DI PT. PRAKARSALANGGENG MAJU BERSAMA. S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

H

HARTANTO, EKA (2020) ANALISIS SISTEM ANTRIAN PERJALANAN KERETA UNTUK MEMINIMALKAN WAKTU TUNGGU DI STASIUN MANGGARAI. S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

R

RAHMAH, DWI RIZKIA (2019) ANALISIS BEBAN KERJA UNTUK MENENTUKAN JUMLAH OPTIMAL TENAGA KERJA DENGAN METODE WORK SAMPLING DI LABORATORIUM COKE OVEN PLANT PT KRAKATAU STEEL (PERSERO) Tbk. S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

S

SURYANI, ERI (2019) PENGARUH SKEPTISME PROFESIONAL DAN TEKANAN WAKTU TERHADAP PENDETEKSIAN FRAUD (Studi Empiris Pada Kantor Akuntan Publik di Jakarta Barat dan Tangerang Selatan). S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

SUSILOTOMO, FERDIAN (2019) IDENTIFIKASI FAKTOR RISIKO YANG MEMPENGARUHI KETERLAMBATAN WAKTU PADA PROYEK JALUR GANDA KERETA API LINTAS BOGOR - SUKABUMI (Studi kasus : Paket 2 oleh kontraktor PT. XY dan Paket 3 oleh Kontraktor PT. XZ). S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

This list was generated on Tue Oct 27 05:42:02 2020 WIB.