ABIDIN, MAULANA (2025) PENGINTEGRASIAN METODE CRASHING DAN SIX SIGMA TERHADAP KINERJA WAKTU DAN KUALITAS PADA STRUKTUR JEMBATAN LRT. S2 thesis, Universitas Mercu Buana Jakarta.
ADDAWIYAH, SHALWA AN-NISA (2025) ANALISIS PENGARUH FAKTOR MANAJEMEN, TEKNIS, DAN DIGITALISASI TERHADAP KINERJA BIAYA MELALUI KINERJA GREEN SHOREBASE BERBASIS VALUE ENGINEERING. S2 thesis, Universitas Mercu Buana Jakarta.
ARIZA, FRANRIZKA (2025) ANALISIS PENGARUH PENERAPAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM), BIM 3D, DAN LAST PLANNER SYSTEM(LPS) TERHADAP KINERJA KONTRAKTOR DAN WAKTU PELAKSANAAN PROYEK HIGH RISE BUILDING HOTEL DI BEKASI. S2 thesis, Universitas Mercu Buana Jakarta.
B, DICKY ANDRIANTO SAPUTRA (2025) ANALISIS PENGARUH FAKTOR LINGKUNGAN KERJA DAN SUMBER DAYA MANUSIA TERHADAP KINERJA KARYAWAN PADA PEKERJAAN PEMELIHARAAN BANGUNAN. S2 thesis, Universitas Mercu Buana Jakarta.
CHARIS, ABDUL (2025) PENGEMBANGAN KONSEP GREEN BUILDING PADA BANGUNAN STASIUN PENGISIAN BAHAN BAKAR UMUM (SPBU) BERBASIS BREEAM (Building Research Estabilisment Environmental Assessment Method) DENGAN nZEB (Nearly Zero Energy Building) UNTUK MENINGKATKAN COST PERFORMANCE. S2 thesis, Universitas Mercu Buana Jakarta.
ERLANGGA, ANGGA (2025) OPTIMASI BIAYA INVESTASI GREEN INFRASTRUCTURE DENGAN METODE VALUE ENGINEERING PADA SISTEM PENYEDIAAN AIR MINUM KABUPATEN TANGERANG. S2 thesis, Universitas Mercu Buana Jakarta.
FUAD, SAMROTUL (2025) ANALISIS FAKTOR - FAKTOR YANG BERPENGARUH PADA TINGKAT PENERAPAN BUILDING INFORMATION MODELLING (BIM) 4D DI BUMN KONSTRUKSI. S2 thesis, Universitas Mercu Buana Jakarta.
GIARTA, FANTA WAHYU (2025) ANALISIS FAKTOR LINGKUNGAN, FAKTOR PENGUPAHAN, KOORDINASI SERTA PRODUKTIFITAS PEKERJA YANG BERPENGARUH TERHADAP KINERJA WAKTU PENYELESAIAN PROYEK PEMERINTAH DI KOTA PANGKALPINANG. S2 thesis, Universitas Mercu Buana Jakarta.
HARAHAP, ATIKAH (2025) ANALISIS PENGARUH JENIS TANAH TERHADAP BIAYA DAN WAKTU PADA PEKERJAAN PENYELIDIKAN TANAH DI KALIMANTAN. S2 thesis, Universitas Mercu Buana Jakarta.
HARUM, PUTRI (2025) ANALISIS KINERJA WAKTU DAN BIAYA PEMBANGUNAN JALAN TOL SOLO - YOGYAKARTA PAKET 2.2 DENGAN METODE EARNED VALUE. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
HARYANTO, VIAN MARANTHA (2025) ANALISIS EKONOMI DAN KUAT TEKAN BETON, BIAYA SERTA WAKTU PEMANFAATAN LIMBAH PADAT CARBON SULFUR DAN DIRTY SULFUR. S2 thesis, Universitas Mercu Buana Jakarta.
ISKANDAR, DEDE (2025) ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI RISIKO KEGAGALAN PROYEK PADA PEMBANGUNAN GEDUNG DI TANGERANG MENGGUNAKAN METODE SEM PLS DAN IPMA. S2 thesis, Universitas Mercu Buana Jakarta.
ISMANA, APRILIAN (2025) GREEN RETROFIT PADA JETTY DENGAN PEDOMAN ENVISION BERBASIS LEAN - VALUE STREAM MAPPING UNTUK MENGOPTIMALKAN KINERJA WAKTU. S2 thesis, Universitas Mercu Buana Jakarta.
JAUHARI, AGUS (2025) ANALISIS DAMPAK OPERASIONAL LIGHT RAIL TRANSIT (LRT) JABODEBEK TERHADAP PERUBAHAN PEMILIHAN MODA TRANSPORTASI MASYARAKAT (STUDI KASUS: JALUR LINTAS DUKUH ATAS-HARJAMUKTI). S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
KURNIAWAN, ALFAN (2025) ANALISIS PENGARUH PENENTUAN KRITERIA PRIORITAS TERHADAP PENINGKATAN FUNGSI DRAINASE MELALUI KINERJA INSTITUSIONAL DI KOTA SERANG. S2 thesis, Universitas Mercu Buana Jakarta.
LAKSANA, PRIYOGI KARTA (2025) ANALISIS ESTIMASI BIAYA BERBASIS MANAJEMEN KONSTRUKSI, VALUE ENGINEERING, DAN LEAN SIX SIGMA UNTUK PENINGKATAN EFISIENSI BIAYA PADA PROYEK JALAN ANGKUT BATUBARA. S2 thesis, Universitas Mercu Buana Jakarta.
LATIF, FATMAWATI (2025) ANALISIS PENGARUH DESAIN, TENAGA KERJA, MATERIAL, DAN PERALATAN TERHADAP MODEL PENGENDALIAN, KINERJA WAKTU SERTA BIAYA PADA PKERJAAN PONDASI BAWAH PROYEK JEMBATAN. S2 thesis, Universitas Mercu Buana Jakarta.
MEIHADI, RESTU (2025) ANALISIS TINGKAT KOMPETISI, PENAWARAN HARGA, DAN SUMBER DAYA MANUSIA TERHADAP DAYA SAING UNTUK PENYUSUNAN MODEL STRATEGI BAGI KONTRAKTOR KECIL. S2 thesis, Universitas Mercu Buana Jakarta.
MUHAEMIN, ARIS (2025) ANALISIS PENGARUH MANAJEMEN KOMUNIKASI PROYEK TERHADAP OWNER DECISION UNTUK MENINGKATKAN KINERJA WAKTU PELAKSANAAN PADA PROYEK KONSTRUKSI GEDUNG BERTINGKAT TINGGI. S2 thesis, Universitas Mercu Buana Jakarta.
MUSTOFA, DUDI (2025) ANALISIS KEPATUHAN DALAM PELAKSANAAN PROGRAM KESEHATAN DAN KESELAMATAN KERJA (K3) DAN KEPEMIMPINAN TERHADAP KUALITAS PEKERJAAN MELALUI MOTIVASI KERJA PADA PROYEK PEMBANGUNAN RUMAH SUSUN DI DKI JAKARTA. S2 thesis, Universitas Mercu Buana Jakarta.
NAINGGOLAN, SUSI SURYANTA (2025) ANALISIS FAKTOR-FAKTOR RISIKO YANG MEMPENGARUHI KINERJA WAKTU DAN MUTU PADA PROYEK BANGUNAN GEDUNG BERTINGKAT DENGAN METODE SEM-PLS. S2 thesis, Universitas Mercu Buana Jakarta.
NAUVAL, ALFADIN AZZAHRAWAANI EL (2025) ANALISIS EFEKTIVITAS IMPLEMENTASI SISTEM REAL TIME CCTV DAN ANNOUNCER UNTUK PENCEGAHAN KECELAKAAN KERJA DI LOKASI PROYEK KONSTRUKSI DENGAN BUDAYA K3 SAFETY LEADERSHIP PROGRAM 4.0. S2 thesis, Universitas Mercu Buana Jakarta.
NOVIYANTO, OKTA (2025) ANALISIS IMPLEMENTASI RAIN HARVESTING BERBASIS SEL SURYA DAN APLIKASI SERTA PENGARUHNYA TERHADAP GREEN BUILDING. S2 thesis, Universitas Mercu Buana Jakarta.
OKTAVIANI, DIAN SINDI (2025) PENGARUH RISIKO OPERASIONAL DAN EFEKTIVITAS MANAJEMEN PROYEK DALAM MINIMALISASI SENGKETA KONSTRUKSI PADA PROYEK PLTS DENGAN KINERJA SEBAGAI VARIABEL INTERVENING. S2 thesis, Universitas Mercu Buana Jakarta.
PRATAMA, ANGGA ARI ADI (2025) ANALISIS FAKTOR PENYEBAB KLAIM DAN PENYELESAIAN SENGKETA KLAIM PADA PROYEK KONSTRUKSI METODE DESIGN AND BUILD. S2 thesis, Universitas Mercu Buana Jakarta.
PUTRA, RAKA MAULANA (2025) ANALISIS INTEGRATIF KELAYAKAN DALAM PERENCANAAN SISTEM PEMANENAN AIR HUJAN IOT SEL SURYA (SPAHITS) SEBAGAI MITIGASI KEKERINGAN BERBASIS EKONOMI HIJAU. S2 thesis, Universitas Mercu Buana Jakarta.
PUTRI, HILDA AZLIA (2025) OPTIMALISASI PRODUKTIVITAS TENAGA KERJA UNTUK MENINGKATKAN KINERJA WAKTU PADA PEKERJAAN PEMASANGAN ALUMUNIUM COMPOSITE PANEL (ACP) SEBAGAI GREEN FACADE STASIUN KERETA CEPAT. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
REDWAN, MUHAMMAD (2025) ANALISIS PELAKSANAAN PEKERJAAN TERHADAP SISTEM MANAJEMEN MUTU PADA PROYEK INFRASTRUKTUR LIGHT RAIL TRANSIT (LRT) FASE 1B. S2 thesis, Universitas Mercu Buana Jakarta.
RISWANTO, FERY (2025) KAJIAN NUMERIK PENGGUNAAN STRUT & TIE MODEL (STM) PADA PIERHEAD JEMBATAN KANTILEVER GANDA. S1 thesis, Universitas Mercu Buana Jakarta.
SAFFANAH, SYAILATUS (2025) ANALISIS PENGELOLAAN AIR KOTOR DENGAN METODE TANGKI SEPTIK KOMUNAL HIGH DENSITY POLYETHYLENE (HDPE) SISTEM TERCAMPUR. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
SALIM, M. AGUS (2025) ANALISIS PENGARUH AKTIVITAS TAMBANG, DAERAH RESAPAN, SISTEM POLDER DAN KOORDINASI TERHADAP BANJIR DI KOTA PANGKAL PINANG. S2 thesis, Universitas Mercu Buana Jakarta.
SANDRA, DODI (2025) STUDI EKSPERIMENTAL PENGUKURAN VIBRASI MENGGUNAKAN ACCELEROMETER DAN SMARTPHONE PADA GEDUNG BETON BERTULANG (Studi kasus : Gedung Perkantoran 36 Lantai di Jakarta Utara). S2 thesis, Universitas Mercu Buana Jakarta.
SANTOSO, IMAM SUGENG (2025) ANALISIS PENGARUH TINGKAT PENERAPAN BIM 5D TERHADAP KINERJA PROYEK KONSTRUKSI. S2 thesis, Universitas Mercu Buana Jakarta.
SASMITO, HADI (2025) ANALISA PENGARUH CHANGE ORDER PADA SIKLUS KONSTRUKSI TERHADAP COST OVERRUN DAN TIME OVERRUN PADA PROYEK INFRASTRUKTUR JALAN TOL DI INDONESIA. S2 thesis, Universitas Mercu Buana Jakarta.
SEPRIAWAN, YOGI (2025) ANALISIS PERBANDINGAN PERILAKU STRUKTUR ATAS MENGGUNAKAN STRUKTUR SRPMB, SRPMK, SISTEM GANDA DAN SISTEM ISOLASI DASAR (Contoh Kasus: Gedung di Jakarta Timur). S2 thesis, Universitas Mercu Buana Jakarta.
SISWANTO, EKO (2025) PENGARUH KOMITMEN ORGANISASI, MANAJEMEN PENGETAHUAN DAN K3 TERHADAP SAFETY CITIZENSHIP BEHAVIOR DAN KINERJA KESELAMATAN DI PROYEK JALAN AKSES TOL PATIMBAN SUBANG. S2 thesis, Universitas Mercu Buana Jakarta.
SUBAGYO, INDRIAWAN (2025) ANALISIS SUMBER DAYA MULTI PROYEK KONSTRUKSI BENDUNGAN DI PULAU JAWA YANG MEMPENGARUHI KINERJA KONTRAKTOR. S2 thesis, Universitas Mercu Buana Jakarta.
SURONO, SURONO (2025) ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PENERAPAN BANGUNAN GEDUNG HIJAU PADA BANGUNAN GEDUNG BARU DI KOTA TANGERANG. S2 thesis, Universitas Mercu Buana Jakarta.
SWASTANTYO, DIMAS (2025) ANALISIS KONDISI PEKERASAN JALAN DAN PREDIKSI SISA UMUR LAYAN JALAN (STUDI KASUS JALAN PONDOK GEDE RAYA). S1 thesis, UNIVERSITAS MERCU BUANA - BUNCIT.
TOBING, PAHALA R (2025) ANALISIS PENGARUH CHANGE CONTRACT ORDER, TENAGA KERJA, MATERIAL DAN ALAT TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK GEDUNG NEGARA BERTINGKAT RENDAH. S2 thesis, Universitas Mercu Buana Jakarta.
TUASIKAL, BAHAUDIN (2025) ANALISIS PELAKSANAAN KESELAMATAN DAN KESEHATAN KERJA (K3) DAN MOTIVASI KERJA TERHADAP PRODUKTIVITAS PEKERJA MELALUI KOMPETENSI PEKERJA PADA PROYEK PEMBANGUNAN RUMAH SUSUN DI PROVINSI ACEH. S2 thesis, Universitas Mercu Buana Jakarta.
WACONO, HARYO (2025) PENGARUH PENYUSUNAN DAN PELAKSANAAN KONTRAK TERHADAP KESUKSESAN PEMBANGUNAN RUMAH SUSUN TANPA SENGKETA DENGAN SUMBER DAYA DAN PROSES SEBAGAI VARIABEL INTERVENING. S2 thesis, Universitas Mercu Buana Jakarta.
WIJAYA, FERRY PAHLEVI (2025) IMPLEMENTASI ARCHITECTURE ENGINEERING CONSTRUCTION (AEC) BERBASIS ARTIFICIAL INTELLIGENCE (AI) PADA GREEN INDUSTRIAL KELAPA SAWIT UNTUK MENINGKATKAN COST PERFORMANCE. S2 thesis, Universitas Mercu Buana Jakarta.
WIRANI, PUTRI EKA SAKTI (2025) ANALISIS RESPON VIBRASI PADA STRUKTUR GEDUNG BERTINGKAT (STUDI KASUS: GEDUNG DI TANGERANG). S2 thesis, Universitas Mercu Buana Jakarta.