ATMOJO, STEWARD PRIYO (2017) PROSES INSTALASI KOMPONEN PIPA DI PROYEK OFFTAKE STATION. S1 thesis, UNIVERISTAS MERCU BUANA - BUNCIT.
|
Text (COVER)
COVER.pdf Download (448kB) | Preview |
|
![]() |
Text (BAB 1)
BAB I.pdf Restricted to Registered users only Download (146kB) |
|
![]() |
Text (BAB 2)
BAB II.pdf Restricted to Registered users only Download (181kB) |
|
![]() |
Text (BAB 3)
BAB III.pdf Restricted to Registered users only Download (291kB) |
|
![]() |
Text (BAB 4)
BAB IV.pdf Restricted to Registered users only Download (706kB) |
|
![]() |
Text (BAB 5)
BAB V.pdf Restricted to Registered users only Download (101kB) |
|
![]() |
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
DAFTAR PUSTAKA dan LAMPIRAN.pdf Restricted to Registered users only Download (333kB) |
Item Type: | Thesis (S1) |
---|---|
NIM/NIDN Creators: | 41313310025 |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 621 Applied Physics/Fisika terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 621 Applied Physics/Fisika terapan > 621.8 Machine Engineering, Machinery/Teknik Mesin |
Divisions: | Fakultas Teknik > Teknik Mesin |
Depositing User: | Nasruddin Mansyur S.Hum |
Date Deposited: | 06 Oct 2025 03:59 |
Last Modified: | 06 Oct 2025 03:59 |
URI: | http://repository.mercubuana.ac.id/id/eprint/98810 |
Actions (login required)
![]() |
View Item |