HERMAWAN, FIRMAN (2013) Perencanaan Kebutuhan Bahan Baku Gitar Berdasarkan Material Requierment Planning (MRP) Menggunakan Lot Sizing (Studi Kasus Pada PT Meary Jaya). S1 thesis, Universitas Mercu Buana.
Text (HAL COVER)
1. Hal cover.pdf Restricted to Registered users only Download (626kB) |
|
Text (BAB I)
2. BAB 1.pdf Restricted to Registered users only Download (189kB) |
|
Text (BAB II)
3. BAB II.pdf Restricted to Registered users only Download (538kB) |
|
Text (BAB III)
4. BAB III.pdf Restricted to Registered users only Download (441kB) |
|
Text (BAB IV)
5. BAB IV.pdf Restricted to Registered users only Download (539kB) |
|
Text (BAB V)
6. BAB V.pdf Restricted to Registered users only Download (162kB) |
|
Text (DAFTAR PUSTAKA)
7. DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (7kB) |
Item Type: | Thesis (S1) |
---|---|
NIM/NIDN Creators: | 41609010015 |
Subjects: | 600 Technology/Teknologi > 630 Agriculture and Related Technologies/Pertanian dan Teknologi Terkait > 631 Specific Techniques; Apparatus, Equipment, Materials/Teknik Spesifik; Peralatan, Peralatan, Bahan 700 Arts/Seni, Seni Rupa, Kesenian > 780 Music/Seni Musik > 787 Stringed instruments/Alat Musik Gesek dan Alat Musik Petik |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Dede Muksin Lubis |
Date Deposited: | 23 Dec 2024 08:14 |
Last Modified: | 23 Dec 2024 08:14 |
URI: | http://repository.mercubuana.ac.id/id/eprint/93232 |
Actions (login required)
View Item |