SANTOSO, WILIE HADE (2015) ANALISA METODE TAHAPAN PELAKSANAAN PEKERJAAN SUB STRUKTUR DENGAN KONSTRUKSI SISTEM SEMI TOP DOWN (STUDI KASUS PROYEK MNC MEDIA TOWER J.O). S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
Halaman Cover.pdf Download (744kB) | Preview |
|
|
Text (ABSTRAK)
Abstrak.pdf Download (34kB) | Preview |
|
Text (BAB I)
BAB 1.pdf Restricted to Registered users only Download (185kB) |
||
Text (BAB II)
BAB II.pdf Restricted to Registered users only Download (503kB) |
||
Text (BAB III)
BAB III.pdf Restricted to Registered users only Download (79kB) |
||
Text (BAB IV)
BAB IV.pdf Restricted to Registered users only Download (4MB) |
||
Text (BAB V)
BAB V.pdf Restricted to Registered users only Download (184kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
Daftar Pustaka.pdf Restricted to Registered users only Download (6MB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 15 096 |
NIM/NIDN Creators: | 41113120109 |
Uncontrolled Keywords: | MNC Media Tower, Metode, Semi Top Down, Bottom up, Basement |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 01 Aug 2015 15:19 |
Last Modified: | 30 Aug 2022 14:06 |
URI: | http://repository.mercubuana.ac.id/id/eprint/9121 |
Actions (login required)
View Item |