RIDWAN, IWAN (2017) PROSES PEMBUATAN TEMPAT TIDUR TERAPI 2 SECTION DI PT.DINAMIS MANDIRI INDONESIA JAKARTA BARAT. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
cover.pdf Download (610kB) | Preview |
|
Text (BAB I)
BAB I.pdf Restricted to Registered users only Download (211kB) |
||
Text (BAB II)
BAB II.pdf Restricted to Registered users only Download (145kB) |
||
Text (BAB III)
BAB III.pdf Restricted to Registered users only Download (365kB) |
||
Text (BAB IV)
BAB IV.pdf Restricted to Registered users only Download (144kB) |
||
Text (BAB V)
BAB V.pdf Restricted to Registered users only Download (109kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
DAFTAR PUSTAKA DAN LAMPIRAN.pdf Restricted to Registered users only Download (296kB) |
Abstract
PROSES PEMBUATAN TEMPAT TIDUR TERAPI 2 SECTION DI PT.DINAMIS MANDIRI INDONESIA JAKARTA BARAT
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | KP/MSN. 17 102 |
NIM/NIDN Creators: | 41313120044 |
Uncontrolled Keywords: | TEMPAT TIDUR TERAPI, 2 SECTION, PT.DINAMIS MANDIRI INDONESIA JAKARTA BARAT |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 621 Applied Physics/Fisika terapan > 621.8 Machine Engineering, Machinery/Teknik Mesin 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 653 Shorthand/Penulisan Cepat, Penulisan dengan Tangan > 653.3 Machine Systems/Sistem Mesin |
Divisions: | Fakultas Teknik > Teknik Mesin |
Depositing User: | NAJLA |
Date Deposited: | 23 Jul 2024 03:22 |
Last Modified: | 23 Jul 2024 03:22 |
URI: | http://repository.mercubuana.ac.id/id/eprint/89753 |
Actions (login required)
View Item |