DARMAWAN, GERI (2023) PEMODELAN DAN SIMULASI DALAM MEREDUKASI WASTE PADA PRODUK PART AUTOMOTIVE BERBASIS LEAN MANUFACTURING DIPERUSAHAAN MANUFACTURE AUTOMOTIVE. S1 thesis, Universitas Mercu Buana Bekasi.
|
Text
41618320029 - GERI DARMAWAN - 01 COVER.pdf Download (1MB) | Preview |
|
|
Text
41618320029 - GERI DARMAWAN - 02 ABSTRAK.pdf Download (360kB) | Preview |
|
Text
41618320029 - GERI DARMAWAN - 03 BAB 1.pdf Restricted to Registered users only Download (504kB) |
||
Text
41618320029 - GERI DARMAWAN - 04 BAB 2.pdf Restricted to Registered users only Download (840kB) |
||
Text
41618320029 - GERI DARMAWAN - 05 BAB 3.pdf Restricted to Registered users only Download (554kB) |
||
Text
41618320029 - GERI DARMAWAN - 06 BAB 4.pdf Restricted to Registered users only Download (1MB) |
||
Text
41618320029 - GERI DARMAWAN - 07 BAB 5.pdf Restricted to Registered users only Download (862kB) |
||
Text
41618320029 - GERI DARMAWAN - 08 BAB 6.pdf Restricted to Registered users only Download (359kB) |
||
Text
41618320029 - GERI DARMAWAN - 09 Daftar Pustaka.pdf Restricted to Registered users only Download (322kB) |
||
Text
41618320029 - GERI DARMAWAN - 10 Lampiran.pdf Restricted to Registered users only Download (237kB) |
Abstract
ABSTRAK Pada perusahaan manufacture automotive ditemukan waste yang menyebabkan efisiensi dan efektivitas proses produksihanya 84%. Kendala yang dihadapi adalah tidak tercapainya target produksi yang sudah ditetapkan perusahaan yaitu sebesar 93%. Penelitian ini bertujuan untuk mengeliminasi waste pada proses produksi dengan memberikan rekomendasi perbaikan dan simulasi hasil perbaikan. Langkah awal dilakukan identifikasi proses produksi dan waste menggunakan Value Stream Mapping (VSM), dan Waste Assessment Model (WAM). Berdasarkan WAM yang di visualisasikan dengan diagram fishbone terdapat waste yang berasal dari 4M yaitu man, mother nature, method dan machine. Untuk mendapatkan hasil Selanjutnya adalah dengan pemetaan waste dengan Value Stream Analysis Tools (VALSAT) menggunakan Process Activity Mapping (PAM) yang diketahui terdapat beberapa aktivitas operasi Value Added (VA) dan Necessary But Non Value Added (NNVA). Kemudian dilakukan analisis akar masalah dengan Root Cause Analysis (RCA) 5 Whys dan analisis perancangan rekomendasi perbaikan menggunakan tool RCA 5W+1H. Menghasilkan aktivitas rekomendasi perbaikan yang disimulasikan dengan software promodel, diketahui terdapat penurunan total lead time dari 96,27 detik menjadi 83,94 detik dengan menghilangkan 2 kegiatan aktivitas NNVA, dan diketahui hasil simulasi dengan total exit entitas throttle body assy finish goods adalah sebanyak 2.632 pcs. Kata kunci: Lean Manufacturing, Value Stream Mapping (VSM), Waste Assessment Model (WAM), Value Stream Analysis Tools (VALSAT), Root Cause Analysis (RCA), Simulasi Promodel. ABSTRACT In manufacturing automotive companies, waste is found which causes the efficiency and effectiveness of the production process to only 84%. The obstacle faced is not achieving the production target that has been set by the company, which is 93%. This study aims to eliminate waste in the production process by providing recommendations for improvements and simulating the results of improvements. The first step is to identify the production process and waste using Value Stream Mapping (VSM), and Waste Assessment Model (WAM). Based on WAM which is visualized with a fishbone diagram, there are wastes that come from 4M, namely man, mother nature, method and machine. To get the next result is waste mapping with Value Stream Analysis Tools (VALSAT) using Process Activity Mapping (PAM) which is known to have several Value Added (VA) and Necessary But Non Value Added (NNVA) operations. Then the root cause analysis was carried out using the 5 Whys Root Cause Analysis (RCA) and analysis of design recommendations for improvement using the RCA 5W+1H tool. Resulting in recommendations for improvement activities simulated with promodel software, it s known that there is a decrease in the total lead time from 96.27 sec to 83.94 sec by eliminating 2 NNVA activities, and it s known that the simulation results show that the total exit entity throttlebody assy finish goods is 2,632 pcs. Keyword: Lean Manufacturing, Value Stream Mapping (VSM), Waste Assessment Model (WAM), Value Stream Analysis Tools (VALSAT), Root Cause Analysis (RCA), Promodel Simulation.
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND 23 002 |
NIM/NIDN Creators: | 41618320029 |
Uncontrolled Keywords: | Lean Manufacturing, Value Stream Mapping (VSM), Waste Assessment Model (WAM), Value Stream Analysis Tools (VALSAT), Root Cause Analysis (RCA), Simulasi Promodel |
Subjects: | 700 Arts/Seni, Seni Rupa, Kesenian > 750 Painting and Paintings/Seni Lukis dan Lukisan > 758 Other Subjects/Subjel Lainnya > 758.6 Industrial and Technical Subjects/Subjek Industri dan Teknik |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | siti maisyaroh |
Date Deposited: | 04 Jan 2024 05:06 |
Last Modified: | 04 Jan 2024 05:06 |
URI: | http://repository.mercubuana.ac.id/id/eprint/85135 |
Actions (login required)
View Item |