HARTOYO, AGUNG (2015) ANALISIS PERBANDINGAN BIAYA DAN WAKTU BREAK EVENT POINT (BEP) PERANCAH BEKISTING PCH SEWA DENGAN INVESTASI (STUDI KASUS PROYEK ST. MORITZ TOWER AMBASSADOR-2). S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1.Halaman Cover.pdf Download (488kB) | Preview |
|
|
Text (ABSTRAK)
2.Abstrak.pdf Download (87kB) | Preview |
|
Text (BAB I)
3.BAB 1.pdf Restricted to Registered users only Download (134kB) |
||
Text (BAB II)
4.BAB 2.pdf Restricted to Registered users only Download (967kB) |
||
Text (BAB III)
5.BAB 3.pdf Restricted to Registered users only Download (120kB) |
||
Text (BAB IV)
6.BAB 4.pdf Restricted to Registered users only Download (795kB) |
||
Text (BAB V)
7.Bab 5.pdf Restricted to Registered users only Download (90kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
8.Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (1MB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 15 047 |
NIM/NIDN Creators: | 41108110039 |
Uncontrolled Keywords: | Perancah Bekisting PCH, Investasi, Sewa, Perbandingan |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 21 Feb 2015 16:17 |
Last Modified: | 09 Aug 2022 04:40 |
URI: | http://repository.mercubuana.ac.id/id/eprint/8243 |
Actions (login required)
View Item |