OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK DENGAN METODE CRASHING PADA PROYEK SATRIO TOWER

RIFAI, (2015) OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK DENGAN METODE CRASHING PADA PROYEK SATRIO TOWER. S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (HAL COVER)
1. HALAMAN JUDUL.pdf

Download (755kB) | Preview
[img]
Preview
Text (ABSTRAK)
2. Abstrak.pdf

Download (105kB) | Preview
[img] Text (BAB I)
3. BAB 1.pdf
Restricted to Registered users only

Download (601kB)
[img] Text (BAB II)
4. BAB 2.pdf
Restricted to Registered users only

Download (477kB)
[img] Text (BAB III)
5. BAB 3.pdf
Restricted to Registered users only

Download (327kB)
[img] Text (BAB IV)
6. BAB 4.pdf
Restricted to Registered users only

Download (841kB)
[img] Text (BAB V)
7. BAB 5.pdf
Restricted to Registered users only

Download (138kB)
[img] Text (DAFTAR PUSTAKA DAN LAMPIRAN)
Daftar Pustaka dan Lampiran.pdf
Restricted to Registered users only

Download (5MB)
Item Type: Thesis (S1)
Call Number CD: FT/SIP. 15 046
NIM/NIDN Creators: 41113110096
Uncontrolled Keywords: percepatan, Microsoft Project, lintasan kritis, crashing, cost slope, time cost trade off, optimum.
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Admin Perpus UMB
Date Deposited: 16 Feb 2015 11:43
Last Modified: 12 Sep 2022 13:10
URI: http://repository.mercubuana.ac.id/id/eprint/8103

Actions (login required)

View Item View Item