SALEH, RIZKY RAHADIAN (2019) PERENCANAAN DAN PENGENDALIAN WAKTU PEKERJAAN PROYEK TERHADAP KONTRAKTOR PADA PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA PANAS BUMI DI SUMATERA SELATAN TAHUN 2016 PT. PRIMA ENERGI CONSULT. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
1. Hal Judul-Cover.pdf Download (40kB) | Preview |
|
|
Text (ABSTRAK)
2. Abstrak.pdf Download (58kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
3. Surat Pernyataan.pdf Download (86kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
4. Lembar Pengesahan.pdf Download (401kB) | Preview |
|
|
Text (KATA PENGANTAR)
5. Kata Pengantar.pdf Download (60kB) | Preview |
|
|
Text (DAFTAR ISI)
6. Daftar Isi.pdf Download (77kB) | Preview |
|
|
Text (DAFTAR TABEL)
7. Daftar Tabel.pdf Download (59kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
8. Daftar Gambar.pdf Download (59kB) | Preview |
|
|
Text (DAFTAR LAMPIRAN)
9. Daftar Lampiran.pdf Download (58kB) | Preview |
|
Text (BAB I)
10. Bab 1.pdf Restricted to Registered users only Download (87kB) |
||
Text (BAB II)
11. Bab 2.pdf Restricted to Registered users only Download (300kB) |
||
Text (BAB III)
12. Bab 3.pdf Restricted to Registered users only Download (75kB) |
||
Text (BAB IV)
13. Bab 4.pdf Restricted to Registered users only Download (136kB) |
||
Text (BAB V)
14. Bab 5.pdf Restricted to Registered users only Download (63kB) |
||
Text (DAFTAR PUSTAKA)
15. Daftar Pustaka.pdf Restricted to Registered users only Download (62kB) |
||
Text (LAMPIRAN)
16. Lampiran.pdf Restricted to Registered users only Download (675kB) |
Abstract
This research is to find out the effect of project planning and control on the time and costs needed to complete the project work, and calculate the estimated profit or loss that may occur in the completion of the project. The method used is descriptive analysis method, where the data collected by the author by means of direct observation to related companies, interviews, and literature study in the literature, which is then analyzed so that it can be obtained an overview of the planning and control of time and costs that can considered and can be applied in the company. Based on the results of research and calculations with the PERT Method and CPM, it can be used to manage the time of project completion more efficiently and effectively. Keywords : Construction Projects PERT and CPM method, crashing. Penelitian ini untuk mengetahui pengaruh perencanaan dan pengendalian proyek terhadap waktu dan biaya yang diperlukan untuk penyelesaian pengerjaan proyek, dan menghitung perkiraan keuntungan atau kerugian yang mungkin terjadi dalam penyelesaian proyek. Metode yang digunakan adalah metode deskriptif analisis, dimana data-data yang dikumpulkan oleh penulis dengan cara observasi langsung ke perusahaan yang terkait, wawancara, dan studi literatur pustaka di olah, yang kemudian dianalisis sehingga dapat diperoleh gambaran mengenai perencanaan dan pengendalian waktu maupun biaya yang dapat dipertimbangkan dan dapat diterapkan dalam perusahaan. Berdasarkan hasil penelitian dan perhitungan dengan Metode PERT dan CPM dapat digunakan untuk mengatur waktu penyelesaian proyek dengan lebih efisien dan efektif. Kata kunci : Proyek Kontruksi, PERT dan CPM, crashing