SUMARNA, ADE NANANG (2019) PENERAPAN PERHITUNGAN WAKTU BAKU DENGAN METODE JAM HENTI (STOPWATCH) DI PT. SUMITOMO S.H.I CONSTRUCTION MACHINERY INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01.HAL COVER KP.pdf Download (499kB) | Preview |
|
Text (BAB I)
02.BAB 1 .pdf Restricted to Registered users only Download (57kB) |
||
Text (BAB II)
03.BAB II.pdf Restricted to Registered users only Download (280kB) |
||
Text (BAB III)
04.BAB III .pdf Restricted to Registered users only Download (88kB) |
||
Text (BAB IV)
05.BAB IV.pdf Restricted to Registered users only Download (382kB) |
||
Text (BAB V)
06.BAB V.pdf Restricted to Registered users only Download (46kB) |
||
Text (DAFTAR PUSTAKA)
07.DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (81kB) |
Abstract
PENERAPAN PERHITUNGAN WAKTU BAKU DENGAN METODE JAM HENTI (STOPWATCH) DI PT. SUMITOMO S.H.I CONSTRUCTION MACHINERY INDONESIA
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | KP/IND. 19 174 |
NIM/NIDN Creators: | 41613320017 |
Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 628 Sanitary Engineering and Environmental Protection Engineering/Rekayasa Sanitasi dan Teknik Perlindungan Lingkungan, Teknik Lingkungan > 628.5 Pollution Control and Industrial Sanitation Engineering/Pengawasan Polusi dan Teknik Sanitasi Industri 700 Arts/Seni, Seni Rupa, Kesenian > 750 Painting and Paintings/Seni Lukis dan Lukisan > 758 Other Subjects/Subjel Lainnya > 758.6 Industrial and Technical Subjects/Subjek Industri dan Teknik |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | CALVIN PRASETYO |
Date Deposited: | 29 May 2023 04:34 |
Last Modified: | 29 May 2023 04:34 |
URI: | http://repository.mercubuana.ac.id/id/eprint/77814 |
Actions (login required)
View Item |