HARYANTO, YUSUF EFFENDI (2023) MENGOPTIMALKAN TURN AROUND TIME UNTUK MENGURANGI WASTE PADA PERAWATAN LANDING GEAR PESAWAT BOEING 737 NG DENGAN PENDEKATAN LEAN OF THINKING DI PT GMF AEROASIA Tbk. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01 Cover.pdf Download (324kB) | Preview |
|
|
Text (ABSTRAK)
02 Abstak.pdf Download (21kB) | Preview |
|
Text (BAB I)
03 BAB I.pdf Restricted to Registered users only Download (152kB) |
||
Text (BAB II)
04 BAB II.pdf Restricted to Registered users only Download (136kB) |
||
Text (BAB III)
05 BAB III.pdf Restricted to Registered users only Download (134kB) |
||
Text (BAB IV)
06 BAB IV.pdf Restricted to Registered users only Download (310kB) |
||
Text (BAB V)
07 BAB V.pdf Restricted to Registered users only Download (266kB) |
||
Text (BAB VI)
08 BAB VI.pdf Restricted to Registered users only Download (83kB) |
||
Text (DAFTAR PUSTAKA)
09 DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (105kB) |
||
Text (LAMPIRAN)
10 LAMPIRAN.pdf Restricted to Registered users only Download (95kB) |
Abstract
PT GMF Aeroasia Tbk is a subsidiary of Garuda Indonesia which is engaged in aircraft maintenance, components and aircraft engines. In the component services unit wheel, brake, and landing gear service, one of the main projects is maintenance of the Boeing 737 NG landing gear. In its implementation, there were indications of finding waste in the landing gear overhaul process which should have been completed for 45 days, but in the PK-GMQ and PK-GFN projects, the project completion was delayed. To identify the valueadded activities and non-valueadded activities that occur, a current state mapping and process activity mapping are made with reference to the PK-GMQ and PK-GFN projects which will be implemented in 2021. After identification, identification of waste that occurs in the maintenance process is carried out. In an effort to improve and reduce the waste, a future state mapping, projected improvements, and gate system improvements were made in the maintenance process. If these recommendations can be implemented, the lead time will be reduced from 75.4 days (603 hours) to 44.85 days (385 hours). Keywords: Waste, current state mapping, process activity mapping, value added activity, non valueadded activity, future state mapping, lead time. PT GMF Aeroasia Tbk merupakan salah satu anak perusahaan dari maskapai garuda indonesia yang bergerak di bidang perawatan pesawat, komponen, dan engine pesawat. Pada dinas component services unit wheel, brake, and landing gear salah satu project utamanya adalah perawatan landing gear boeing 737 NG. Pada pelaksanaannya, terjadi indikasi temuan waste pada proses overhaul landing gear ini yang harusnya diselesaikan selama 45 hari, tetapi pada project PK-GMQ dan PK-GFN pelaksanaannya terjadi keterlambatan penyelesaian project tersebut. Untuk mengidentifikasi value added activity dan non valueadded activity yang terjadi dibuatlah current state mapping dan process activity mapping dengan referensi project PK-GMQ dan PK-GFN yang dilaksanakan pada tahun 2021. Setelah teridentifikasi, dilakukan identifikasi waste yang terjadi pada proses perawatan tersebut. Untuk upaya perbaikan dan mengurangi waste tersebut, dibuatlah future state mapping, proyeksi perbaikan, dan perbaikan gate system pada proses perawatan tersebut. Apabila rekomendasi tersebut dapat dilakukan akan didapatkan lead time yang berkurang dari 75,4 hari (603 jam) menjadi 44,85 hari (385 jam). Kata kunci: Waste, current state mapping, process activity mapping, value added activity, non valueadded activity, future state mapping, lead time.
Actions (login required)