ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING (MRP) PADA PT PUTERA MANDIRI TEHNIK

SHIAMI, NUR AFNI FAJRIATI (2022) ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING (MRP) PADA PT PUTERA MANDIRI TEHNIK. S1 thesis, Universitas Mercu Buana Bekasi.

[img]
Preview
Text
41618210012 - Nur Afni Fajriati Shiami - 02 Cover.pdf

Download (432kB) | Preview
[img]
Preview
Text
41618210012 - Nur Afni Fajriati Shiami - 03 Abstrak.pdf

Download (161kB) | Preview
[img] Text
41618210012 - Nur Afni Fajriati Shiami - 04 BAB 1.pdf
Restricted to Registered users only

Download (144kB)
[img] Text
41618210012 - Nur Afni Fajriati Shiami - 05 BAB 2.pdf
Restricted to Registered users only

Download (404kB)
[img] Text
41618210012 - Nur Afni Fajriati Shiami - 06 BAB 3.pdf
Restricted to Registered users only

Download (98kB)
[img] Text
41618210012 - Nur Afni Fajriati Shiami - 07 BAB 4.pdf
Restricted to Registered users only

Download (819kB)
[img] Text
41618210012 - Nur Afni Fajriati Shiami - 08 BAB 5.pdf
Restricted to Registered users only

Download (165kB)
[img] Text
41618210012 - Nur Afni Fajriati Shiami - 09 BAB 6.pdf
Restricted to Registered users only

Download (212kB)
[img] Text
41618210012 - Nur Afni Fajriati Shiami - 10 Daftar Pustaka.pdf
Restricted to Registered users only

Download (321kB)
[img] Text
41618210012 - Nur Afni Fajriati Shiami - 11 Lampiran.pdf
Restricted to Registered users only

Download (763kB)

Abstract

ABSTRAK PT Putera Mandiri Tehnik merupakan perusahaan yang bergerak di bidang industri Koraseri yang memfokuskan produksi Karoseri Bak Besi, Box Besi, Dump Truck, dll. Permasalahan yang dihadapi adalah tidak adanya perencanaan persediaan bahan baku sehingga sering terjadinya keterlambatan penerimaan bahan baku yang dapat menyebabkan ketidaklancaran kegiatan produksi. Objek penelitian ini adalah Karoseri Truk Bak Besi 3way Hino 130 MDL karena memiliki jumlah permintaan terbanyak. Tujuan penelitian ini adalah untuk mendapatkan jadwal induk produksi, perencanaan kebutuhan bahan baku menggunakan metode Material Requirement Planning (MRP), serta metode lot sizing yang paling optimal dalam pengendalian persediaan di PT Putera Mandiri Tehnik. Metode analisis data yang digunakan adalah peramalan permintaan produk dengan metode time-series, Material Requirements Planning (MRP), serta teknik lot sizing Lot For Lot (LFL) dan Economic Order Quantity (EOQ). Hasilnya menunjukkan jadwal induk produksi Karoseri Truk Bak Besi 3way Hino 130 MDL untuk bulan Oktober, November, dan Desember 2021 masing-masing sebanyak 9, 8, dan 8 unit. Berdasarkan MRP diketahui bahwa untuk membuat karoseri tersebut membutuhkan 10 bahan baku dengan jumlah dan kapan masing-masing bahan baku tersebut dibutuhkan. Dari kedua teknik ukuran lot yang dalam MRP, teknik EOQ memperoleh total biaya persediaan yang lebih rendah yaitu Rp. 5.192.538 bila dibandingkan dengan teknik LFL. Kata kunci: Pengendalian Persediaan, peramalan, Material Requirement Planning, Lot Sizing: Lot For Lot, Economic Order Quantity, Karoseri Truk Bak Besi 3way Hino 130 MDL ABSTRACT PT Putera Mandiri Tehnik is a company engaged in the Corasseries industry that focuses on the production of Truck Body, Flat Deck, Dump Truck, Wingbox Truck, and others. The problem faced is that there is no raw material inventory planning so that there are often delays in receiving raw materials which can cause production discontinuity. The object of this research is the Truck Body 3way Hino 130 MDL because it has the most demand. The purpose of this study was to obtain a master production schedule, planning raw material requirements using the Material Requirement Planning (MRP) method, and the most optimal lot sizing method in inventory control at PT Putra Mandiri Teknik. The data analysis method used is demand forecasting with time series methods, Material Requirement Planning (MRP), and lot sizing techniques Lot for Lot (LFL) and Economic Order Quantity (EOQ). The results show the master production schedule of the Truck Body 3way Hino 130 MDL for October, November, and December 2021, which are 9, 8, and 8 units, respectively. Based on the MRP, it is known that to make a body it takes 10 raw materials with the amount and time required for each raw material. From the two measurement techniques used in the MRP that have been carried out, the EOQ technique obtains a lower total inventory cost of Rp. 5.192.538 when compared to the LFL technique. Keywords: Inventory Control, Forecasting, Material Requirement Planning, Lot Sizing: Lot For Lot, Economic Order Quantity, Truck Body 3way Hino 130 MDL

Item Type: Thesis (S1)
Call Number CD: FT/IND 22 029
NIM/NIDN Creators: 41618210012
Uncontrolled Keywords: Kata kunci: Pengendalian Persediaan, peramalan, Material Requirement Planning, Lot Sizing: Lot For Lot, Economic Order Quantity, Karoseri Truk Bak Besi 3way Hino 130 MDL
Subjects: 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.5 Management of Production/Manajemen Produksi
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: siti maisyaroh
Date Deposited: 23 Dec 2022 06:37
Last Modified: 23 Dec 2022 06:37
URI: http://repository.mercubuana.ac.id/id/eprint/72758

Actions (login required)

View Item View Item