ANALISIS PERBAIKAN WAKTU SETUP MESIN BUBUT DAN MESIN GRINDING DALAM PROSES PRODUKSI PART END BLOCK DI PERUSAHAAN MANUFAKTUR DENGAN MENGGUNAKAN SINGLE MINUTES EXCHANGE OF DIE (SMED)

AJI, MIFTAHUL MAULANA (2022) ANALISIS PERBAIKAN WAKTU SETUP MESIN BUBUT DAN MESIN GRINDING DALAM PROSES PRODUKSI PART END BLOCK DI PERUSAHAAN MANUFAKTUR DENGAN MENGGUNAKAN SINGLE MINUTES EXCHANGE OF DIE (SMED). S1 thesis, Universitas Mercu Buana Bekasi.

[img]
Preview
Text
41618210001 - MIFTAHUL MAULANA AJI - 02 Cover.pdf

Download (251kB) | Preview
[img]
Preview
Text
41618210001 - MIFTAHUL MAULANA AJI - 03 Abstrak.pdf

Download (65kB) | Preview
[img] Text
41618210001 - MIFTAHUL MAULANA AJI - 04 BAB 1.pdf
Restricted to Registered users only

Download (104kB)
[img] Text
41618210001 - MIFTAHUL MAULANA AJI - 05 BAB 2.pdf
Restricted to Registered users only

Download (195kB)
[img] Text
41618210001 - MIFTAHUL MAULANA AJI - 06 BAB 3.pdf
Restricted to Registered users only

Download (74kB)
[img] Text
41618210001 - MIFTAHUL MAULANA AJI - 07 BAB 4.pdf
Restricted to Registered users only

Download (275kB)
[img] Text
41618210001 - MIFTAHUL MAULANA AJI - 08 BAB 5.pdf
Restricted to Registered users only

Download (148kB)
[img] Text
41618210001 - MIFTAHUL MAULANA AJI - 09 BAB 6.pdf
Restricted to Registered users only

Download (82kB)
[img] Text
41618210001 - MIFTAHUL MAULANA AJI - 10 Daftar Pustaka.pdf
Restricted to Registered users only

Download (69kB)
[img] Text
41618210001 - MIFTAHUL MAULANA AJI - 11 Lampiran.pdf
Restricted to Registered users only

Download (86kB)

Abstract

ABSTRAK Perusahaan manufaktur adalah perusahaan yang memproduksi dies progressive dan dies tandem. Sebagai perusahaan yang melakukan proses produksi dan perakitan seringkali mengalami kendala dalam proses produksi khusunya untuk produk part end block. End Block adalah salah satu part pada bagian dies progressive. Setelah dilakukan pada penelitian sebelumnya menggunakan simulasi komputer menghasilkan adanya hambatan pada mesin bubut dan mesin grinding. Cara yang dapat dilakukan perusahaan untuk mengatasi masalah tersebut adalah dengan mereduksi waktu yang dibutuhkan saat melakukan setup mesin agar dapat memperbaiki efektivitas penggunaan mesin dengan pendekatan metode Single Minute Exchange of Die (SMED). Berdasarkan hasil identifikasi aktivitas dengan metode SMED terdapat 4 aktivitas yang dikonversikan pada mesin bubut dan mesin grinding, sehingga dapat mengurangi 3.50 menit pada mesin bubut dan pada mesin grinding dapat mengurangi 8.30 menit. Maka waktu yang didapatkan mejadi menjadi 119,12 menit pada mesin bubut dan 116.10 menit pada mesin grinding, jika di total maka waktu yang dihasilkan yaitu 235,22 menit, dalam mengasilkan 1 set end block untuk 1 dies progressive. Dengan hal tersebut jika dalam pengerjaan 2 set untuk 2 dies progressive maka waktu yang dihasilkan 470,44 menit. Dengan hasil tersebut, maka metode SMED dapat memangkas waktu 66 menit. Hal ini menjadi usulan bagi perusahaan. Kata kunci : Single Minute Exchange of Die (SMED), simulasi komputer, Mesin Bubut dan Mesin Grinding ABSTRACT Manufacturing companies are companies that produce progressive dies and tandem dies. As a company that carries out production and assembly processes, we often experience problems in the production process, especially for end block part products. End Block is one of the parts in the progressive dies section. Having carried out previous studies using computer simulations resulted in obstacles in the lathe and grinding machines. The way that companies can do to overcome this problem is to reduce the time required when setting up the machine in order to improve the effectiveness of using the machine with the Single Minute Exchange of Die (SMED) approach. Based on the results of activity identification with the SMED method, there are 4 activities that are converted on a lathe and grinding machine, so it can reduce 3.50 minutes on a lathe and on a grinding machine it can reduce 8.30 minutes. Then the time obtained becomes 119.12 minutes on a lathe and 116.10 minutes on a grinding machine, if in total, the resulting time is 235.22 minutes, in producing 1 set of end blocks for 1 progressive dies. With this, if in 2 sets for 2 progressive dies, the resulting time is 470.44 minutes. With these results, the SMED method can cut time by 66 minutes. This is a proposal for the company. Keywords : Single Minute Exchange of Die (SMED), computer simulation, Lathes and Grinding Machines

Item Type: Thesis (S1)
Call Number CD: FT/IND 22 027
NIM/NIDN Creators: 41618210001
Uncontrolled Keywords: Kata kunci : Single Minute Exchange of Die (SMED), simulasi komputer, Mesin Bubut dan Mesin Grinding
Subjects: 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.6 Quality Management/Manajemen Kualitas
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: siti maisyaroh
Date Deposited: 23 Dec 2022 06:23
Last Modified: 23 Dec 2022 06:23
URI: http://repository.mercubuana.ac.id/id/eprint/72754

Actions (login required)

View Item View Item