REDUKSI WASTE DENGAN METODE VALSAT DAN FMEA PADA PROSES WELDING UNDER BODY DI PT. TMMIN

TRIANA, HERY (2022) REDUKSI WASTE DENGAN METODE VALSAT DAN FMEA PADA PROSES WELDING UNDER BODY DI PT. TMMIN. S1 thesis, Universitas Mercu Buana Bekasi.

[img]
Preview
Text
41617320019 - Hery Triana - 02 COVER.pdf

Download (286kB) | Preview
[img]
Preview
Text
41617320019 - Hery Triana - 03 ABSTRAK.pdf

Download (29kB) | Preview
[img] Text
41617320019 - Hery Triana - 04 BAB 1.pdf
Restricted to Registered users only

Download (134kB)
[img] Text
41617320019 - Hery Triana - 05 BAB 2.pdf
Restricted to Registered users only

Download (380kB)
[img] Text
41617320019 - Hery Triana - 06 BAB 3.pdf
Restricted to Registered users only

Download (159kB)
[img] Text
41617320019 - Hery Triana - 07 BAB 4.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
41617320019 - Hery Triana - 08 BAB 5.pdf
Restricted to Registered users only

Download (205kB)
[img] Text
41617320019 - Hery Triana - 09 BAB 6.pdf
Restricted to Registered users only

Download (29kB)
[img] Text
41617320019 - Hery Triana - 10 Daftar Pustaka.pdf
Restricted to Registered users only

Download (35kB)
[img] Text
41617320019 - Hery Triana - 11 Lampiran.pdf
Restricted to Registered users only

Download (978kB)

Abstract

ABSTRAK PT. TMMIN melakukan peningkatan daya saing melalui peningkatan efisiensi. Tetapi, Efisiensi di welding tidak tercapai, dari target 97%, aktual effisiensi 95,9%. Line Stop didominasi late process sebesar 1,7%. Late process adalah indikasi kuat adanya waste. Penelitian dilakukan menggunakan metode Value Stream Analysis Tools (VALSAT), ditemukan adanya 3 waste kritis, yaitu: motion 24,4 %, overproduction 18,5 % , dan inventory 15.8%. Dengan metode Root Cause Analysis (RCA) digabungkan Failure Mode and Effect Analysis (FMEA), didapatkanlah 4 skala prioritas root cause, yaitu: Sistem assembling medium part secara manual, Sistem packing style part menggunakan pallet besi, Sistem produksi big lot system dan Jumlah wadah penempatan part mencapai 800 unit. Penanggulangan yang dilakukan adalah Membuat hanger full auto, Merubah packing style dari pallet besi ke polibox dan Dolly, Merubah sisitem produksi menjadi small lot system, Membuat dolly common (1 dolly untuk memasang 8 varian part). Dengan membandingkan Value Stream Mapping kondisi sebelum dan sesudah, hasil akhirnya: Reduksi waktu kerja 178 menit, mereduksi 58 aktifitas, Sehingga dapat meningkatkan effisiensi proses pembuatan under body assy dari 95,9% menjadi 98,4%. Kata kunci: efisiensi, waste, under body, VSM, VALSAT, FMEA ABSTRACT PT. TMMIN improves competitiveness by increasing efficiency. However, the efficiency in welding was not achieved, from the target of 97%, the actual efficiency was 95.9%. Line Stop is dominated by the late process by 1.7%. The late process is a strong indication of waste. The study was conducted using the Value Stream Analysis Tools (VALSAT) method, it was found that there were 3 critical wastes, namely: motion 24.4%, overproduction 18.5%, and inventory 15.8%. With the Root Cause Analysis (RCA) method combined with Failure Mode and Effect Analysis (FMEA), 4 priority root causes are obtained, namely: Manual medium part assembling system, Packing style part system using iron pallets, Big lot system production system, and Number of containers placement of parts reaches 800 units. The countermeasures are making a full auto hanger, changing the packing style from iron pallets to poly boxes and dollies, changing the production system to a small lot system, making dolly common (1 dolly to install 8 part variants). By comparing the Value Stream Mapping conditions before and after, the final result: Reduction of 178 minutes of working time, reducing 58 activities, to increase the efficiency of the underbody assembly process from 95.9% to 98.4%. Keywords: efficiency, waste, underbody, VSM, VALSAT, FMEA

Item Type: Thesis (S1)
Call Number CD: FT/IND 22 021
NIM/NIDN Creators: 41617320019
Uncontrolled Keywords: Kata kunci: efisiensi, waste, under body, VSM, VALSAT, FMEA
Subjects: 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.5 Management of Production/Manajemen Produksi
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: siti maisyaroh
Date Deposited: 23 Dec 2022 05:33
Last Modified: 23 Dec 2022 05:33
URI: http://repository.mercubuana.ac.id/id/eprint/72748

Actions (login required)

View Item View Item