ILHAM, SYAWAPRI (2015) ANALISIS PENJADWALAN DENGAN METODE CPM(Critical Path Method) DAN PERT (Program Evaluation Review Technique) UNTUK MENGEFISIENSI WAKTU PADA PROYEK PEMBANGUNAN RUMAH TYPE 36. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
Hal Cover.pdf Download (67kB) | Preview |
|
|
Text (ABSTRAK)
Abstrak.pdf Download (26kB) | Preview |
|
Text (BAB I)
BAB 1.pdf Restricted to Registered users only Download (57kB) |
||
Text (BAB II)
BAB 2.pdf Restricted to Registered users only Download (228kB) |
||
Text (BAB III)
BAB 3.pdf Restricted to Registered users only Download (35kB) |
||
Text (BAB IV)
BAB 4.pdf Restricted to Registered users only Download (152kB) |
||
Text (BAB V)
BAB 5.pdf Restricted to Registered users only Download (172kB) |
||
Text (BAB VI)
BAB 6.pdf Restricted to Registered users only Download (36kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
Hal Daftar pustaka dan Lampiran.pdf Restricted to Registered users only Download (150kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 15 033 |
NIM/NIDN Creators: | 41613120061 |
Uncontrolled Keywords: | Manajemen Proyek, Analisa Network, CPM, PERT, Jalur Kritis, Optimisasi Waktu, Network Planning |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 07 Nov 2015 14:05 |
Last Modified: | 01 Jul 2022 03:01 |
URI: | http://repository.mercubuana.ac.id/id/eprint/7098 |
Actions (login required)
View Item |