ANALISA PENJADWALAN WAKTU PROYEK C0NTRUCTION CIVIL FOUNDATION ALFA MART DENGAN METODE CRITICAL PATH METHOD (CPM) ( Studi kasus CV.Putri Tunggal General Contractor )

Permana, Denny (2015) ANALISA PENJADWALAN WAKTU PROYEK C0NTRUCTION CIVIL FOUNDATION ALFA MART DENGAN METODE CRITICAL PATH METHOD (CPM) ( Studi kasus CV.Putri Tunggal General Contractor ). S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (Abstrak)
Abstrak.pdf

Download (211kB) | Preview
[img]
Preview
Text (Cover)
Cover.pdf

Download (951kB) | Preview
[img] Text (Bab 1)
Bab 1.pdf
Restricted to Registered users only

Download (260kB)
[img] Text (Bab 2)
Bab 2.pdf
Restricted to Registered users only

Download (342kB)
[img] Text (Bab 3)
Bab 3.pdf
Restricted to Registered users only

Download (200kB)
[img] Text (Bab 4)
Bab 4.pdf
Restricted to Registered users only

Download (897kB)
[img] Text (Bab 5)
Bab 5.pdf
Restricted to Registered users only

Download (665kB)
[img] Text (Bab 6)
Bab 6.pdf
Restricted to Registered users only

Download (126kB)
[img] Text (Daftar Pustaka dan Lampiran)
Daftar Pustaka dan Lampiran.pdf
Restricted to Registered users only

Download (173kB)
Item Type: Thesis (S1)
Call Number CD: FT/IND. 15 028
NIM/NIDN Creators: 41610010025
Uncontrolled Keywords: Manajemen Proyek, Metode Jalur Kritis, CPM Method , Jaringan Kerja, Float.
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Admin Perpus UMB
Date Deposited: 27 Feb 2015 09:46
Last Modified: 04 May 2017 04:34
URI: http://repository.mercubuana.ac.id/id/eprint/6989

Actions (login required)

View Item View Item