ANALISA PENJADWALAN WAKTU PROYEK C0NTRUCTION CIVIL FOUNDATION ALFA MART DENGAN METODE CRITICAL PATH METHOD (CPM) ( Studi kasus CV.Putri Tunggal General Contractor )

Permana, Denny (2015) ANALISA PENJADWALAN WAKTU PROYEK C0NTRUCTION CIVIL FOUNDATION ALFA MART DENGAN METODE CRITICAL PATH METHOD (CPM) ( Studi kasus CV.Putri Tunggal General Contractor ). S1 thesis, Universitas Mercu Buana.

[img] Other (HAL COVER)
1] HAL COVER.PDF
Restricted to Registered users only

Download (516kB)
[img] Other (ABSTRAK)
Abstrak.PDF
Restricted to Registered users only

Download (174kB)
[img] Text (BAB I)
2] BAB I.pdf
Restricted to Registered users only

Download (168kB)
[img] Text (BAB II)
3] BAB II.pdf
Restricted to Registered users only

Download (316kB)
[img] Text (BAB III)
4] BAB III.pdf
Restricted to Registered users only

Download (181kB)
[img] Text (BAB IV)
5] BAB IV.pdf
Restricted to Registered users only

Download (771kB)
[img] Text (BAB V)
6] BAB V.pdf
Restricted to Registered users only

Download (449kB)
[img] Text (BAB VI)
7] BAB VI.pdf
Restricted to Registered users only

Download (102kB)
[img] Text (DAFTAR PUSTAKA)
8] DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (152kB)
Item Type: Thesis (S1)
Call Number CD: FT/IND. 15 028
NIM/NIDN Creators: 41610010025
Uncontrolled Keywords: Manajemen Proyek, Metode Jalur Kritis, CPM Method , Jaringan Kerja, Float.
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Admin Perpus UMB
Date Deposited: 27 Feb 2015 09:46
Last Modified: 06 Mar 2026 03:30
URI: http://repository.mercubuana.ac.id/id/eprint/6989

Actions (login required)

View Item View Item