ANALISA PENJADWALAN PROYEK FIRE FIGHTING DENGAN METODE CRITICAL CHAIN

MAULANA, HADI (2020) ANALISA PENJADWALAN PROYEK FIRE FIGHTING DENGAN METODE CRITICAL CHAIN. S1 thesis, UNIVERSITAS MERCU BUANA.

[img]
Preview
Text
1.Halaman Judul.pdf

Download (56kB) | Preview
[img]
Preview
Text
2.Halaman Pernyataan.pdf

Download (128kB) | Preview
[img]
Preview
Text
3.Halaman Pengesahan.pdf

Download (95kB) | Preview
[img]
Preview
Text
4.Abstrak.pdf

Download (48kB) | Preview
[img]
Preview
Text
5.Kata Pengantar.pdf

Download (45kB) | Preview
[img]
Preview
Text
7.Daftar Tabel.pdf

Download (79kB) | Preview
[img]
Preview
Text
6.Daftar Isi.pdf

Download (53kB) | Preview
[img]
Preview
Text
8.Daftar Gambar.pdf

Download (79kB) | Preview
[img] Text
9.BAB 1.pdf
Restricted to Registered users only

Download (61kB)
[img] Text
10.BAB 2.pdf
Restricted to Registered users only

Download (375kB)
[img] Text
11.BAB 3.pdf
Restricted to Registered users only

Download (70kB)
[img] Text
12.BAB 4.pdf
Restricted to Registered users only

Download (400kB)
[img] Text
13.BAB 5.pdf
Restricted to Registered users only

Download (56kB)
[img] Text
15.Daftar Pustaka.pdf
Restricted to Registered users only

Download (57kB)
[img] Text
14.BAB 6.pdf
Restricted to Registered users only

Download (48kB)

Abstract

Penelitian ini dilakukan untuk menganalisis penjadwalan proyek fire fighting tujuan mengetahui durasi optimal proyek dapat diselesaikan. Indikator yang digunakan untuk memperhitungkan durasi optimal adalah dengan hubungan keterkaitan antar pekerjaan, perubahan durasi dengan 50% probabilitas dan project buffer. Penjadwalan yang sudah dibuat sebelumnya dilakukan pengklasifikasian kegiatan proyek dan selanjutnya dilakukan perhitungan dengan metode critical chain untuk mencari dan menentukan besaran buffer project yang akan digunakan untuk menganalisis penjadwalan yang sudah dibuat sebelumnya. Hasil dari perhitungan metode critical chain didapat waktu penyelesaian proyek menjadi 1563 hari kerja dari 1830 hari kerja. Melalui hasil analisis tersebut dapat disimpulkan bahwa proyek dapat dipercepat dengan metode critical chain dan pemakaian durasi project buffer dapat memberikan informasi bagi pihak pelaksana proyek dalam mengambil tindakan yang terkait dengan pengendalian saat pelaksanaan proyek, khususnya dalam pengendalian resiko yang akan membuat proyek terlambat. Kata Kunci : Analisis Penjadwalan Proyek, Manajemen Proyek, Fire Fighting, Critical Chain http://digilib.mercubuana.ac.id/ v v ABSTRACT This research was conducted to analyze the scheduling of a project with the fire fighting aim of knowing the optimal duration of the project to be completed. The indicators used to calculate the optimal duration are the relationship between jobs, the change in duration with a 50% probability and the project buffer. Scheduling that has been made previously is carried out by classifying the project activities and then calculating with the method critical chain to find and determine the amount of the project buffer that will be used to analyze the previously made scheduling. The results of the calculation of the method critical chain obtained the project completion time to be 1563 working days from 1830 working days. From the results of this analysis, it can be concluded that the project can be accelerated by the method critical chain and the use of project buffer duration can provide information for project executors in taking actions related to controlling during project implementation, especially in controlling risks that will make the project late. Keywords : Project Scheduling Analysis, Project Management, Fire Fighting, Critical Chain.

Item Type: Thesis (S1)
Call Number CD: FT/IND 20 007
NIM/NIDN Creators: 41618310083
Uncontrolled Keywords: Keywords : Project Scheduling Analysis, Project Management, Fire Fighting, Critical Chain
Subjects: 700 Arts/Seni, Seni Rupa, Kesenian > 750 Painting and Paintings/Seni Lukis dan Lukisan > 758 Other Subjects/Subjel Lainnya > 758.6 Industrial and Technical Subjects/Subjek Industri dan Teknik
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: siti maisyaroh
Date Deposited: 11 Aug 2022 06:42
Last Modified: 11 Aug 2022 06:42
URI: http://repository.mercubuana.ac.id/id/eprint/67356

Actions (login required)

View Item View Item