RAHARJO, LISTYANTO (2015) Analisis Cacat Produk dan Implementasi Proses Produksi pada Produk Needle Protector 38mm Dengan Metode 7 Alat Pengendali Kualitas di PT.X. S1 thesis, Universitas Mercu Buana Bekasi.
|
Text
1. Hal Cover.pdf Download (1MB) | Preview |
|
|
Text
2. Abstrak.pdf Download (93kB) | Preview |
|
Text
3. Skripsi_BAB 1.pdf Restricted to Registered users only Download (130kB) |
||
Text
4. Skripsi_BAB 2.pdf Restricted to Registered users only Download (681kB) |
||
Text
5. Skripsi_BAB 3.pdf Restricted to Registered users only Download (307kB) |
||
Text
6. Skripsi BAB_4.pdf Restricted to Registered users only Download (1MB) |
||
Text
7. Skripsi_BAB_5.pdf Restricted to Registered users only Download (235kB) |
||
Text
8. Skripsi BAB_6.pdf Restricted to Registered users only Download (281kB) |
||
Text
9. Hal Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (482kB) |
Abstract
ABSTRAK Skripsi ini berjudul Analisis Cacat Produk dan Implementasi Proses Produksi pada Produk Needle Protector 38mm Dengan Metode 7 Alat Pengendali Kualitas di PT.X, adanya tujuan skripsi ini adalah untuk mengembalikan standar output produksi. PT. X merupakan perusahaan jepang yang memproduksi alat-alat kesehatan, salah satu dari produknya adalah suntikan. Needle Protectro 38mm salah satu part untuk membuat suntikan. Part tersebut mengalami cacat produk. Penelitian ini difokuskan untuk menghilangkan cacat produk dengan menggunakan 4 metode dari Seven Tools yaitu, Check Sheet, Pareto Diagram, Control Chart, dan Fishbone. Menggunakan 4 metode sudah cukup untuk menganalisa masah cacat produk. Proses pun lebih cepat. Berdasarkan hasil analisa dilakukan implementasi, produk yang sebelum dilakuakan perbaikan hanya dapat menghasil produk 94 dalam satu proses, sedangakan setelah dilakukan perbaikan dalam satu proses dapat mengembaliakn kondisi yang standar yaitu 96 produk dalam satu proses. Keyword : Pengendalian Kualitas, Seven Tolls, Produk Cacat, Rejection Needle Protectro 38mm salah satu part untuk membuat suntikan. Part tersebut mengalami cacat produk. Penelitian ini difokuskan untuk menghilangkan cacat produk dengan menggunakan 4 metode dari Seven Tools yaitu, Check Sheet, Pareto Diagram, Control Chart, dan Fishbone. Menggunakan 4 metode sudah cukup untuk menganalisa masah cacat produk. Proses pun lebih cepat. Berdasarkan hasil analisa dilakukan implementasi, produk yang sebelum dilakuakan perbaikan hanya dapat menghasil produk 94 dalam satu proses, sedangakan setelah dilakukan perbaikan dalam satu proses dapat mengembaliakn kondisi yang standar yaitu 96 produk dalam satu proses. ABSTRACT This thesis titled Product Defect Analysis and Implementation of Production Process in Product Needle Protector 38mm With Method 7 Quality Control Tools in PT.X, have to purpose of this paper is to restore production output standards. PT. X is a Japanese company that manufactures medical devices, one of the products is an injection. Needle Protector 38mm one part to make injections. Part of the disability product. This research is focused to eliminate product defects by using 4 methods of Seven Tools namely, Check Sheet, Pareto Diagrams, Control Chart, and Fishbone. Using four methods is sufficient to analyze problem product defects. The process was faster. Based on the analysis performed implementations, product before action improvement can only result product 94 in the process, while the after repair in a single process can restore conditions standart are 96 products in the process. Keywords: Quality Control, Seven Tolls, Product Defects, Rejection medical devices, one of the products is an injection. Needle Protector 38mm one part to make injections. Part of the disability product. This research is focused to eliminate product defects by using 4 methods of Seven Tools namely, Check Sheet, Pareto Diagrams, Control Chart, and Fishbone. Using four methods is sufficient to analyze problem product defects. The process was faster. Based on the analysis performed implementations, product before action improvement can only result product 94 in the process, while the after repair in a single process can restore conditions standart are 96 products in the process. Keywords: Quality Control, Seven Tolls, Product Defects, Rejection
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND 15 006 |
NIM/NIDN Creators: | 41613310063 |
Uncontrolled Keywords: | Keyword : Pengendalian Kualitas, Seven Tolls, Produk Cacat, Rejection |
Subjects: | 600 Technology/Teknologi > 670 Manufacturing/Manufaktur, Pabrik-pabrik |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | siti maisyaroh |
Date Deposited: | 06 Jul 2022 06:25 |
Last Modified: | 06 Jul 2022 06:25 |
URI: | http://repository.mercubuana.ac.id/id/eprint/64594 |
Actions (login required)
View Item |