ANALISIS ECONOMIC ORDER QUANTITY AND JUST IN TIME SUPPLY SPARE PART PADA PROSES MAINTENANCE ALAT BERAT DI PT. HARITA NICKEL

RAHIM, TAUFIK (2015) ANALISIS ECONOMIC ORDER QUANTITY AND JUST IN TIME SUPPLY SPARE PART PADA PROSES MAINTENANCE ALAT BERAT DI PT. HARITA NICKEL. S2 thesis, Universitas Mercu Buana Jakarta - Menteng.

[img] Text (Cover)
7 COVER DAFTAR ISI.pdf

Download (352kB)
[img] Text (Bab 1)
1 PENDAHULUAN.pdf
Restricted to Registered users only

Download (200kB)
[img] Text (Bab 2)
2 DESKRIPSI ORGANISASI.pdf
Restricted to Registered users only

Download (343kB)
[img] Text (Bab 3)
3 KAJIAN PUSTAKA.pdf
Restricted to Registered users only

Download (376kB)
[img] Text (Bab 4)
4 METODE PENELITIAN.pdf
Restricted to Registered users only

Download (295kB)
[img] Text (Bab 5)
5 HASIL DAN ANALISA.pdf
Restricted to Registered users only

Download (621kB)
[img] Text (Bab 6)
6 KESIMPULAN DAN SARAN.pdf
Restricted to Registered users only

Download (106kB)
[img] Text (Daftar Pustaka)
8 DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (367kB)

Abstract

Inventory problems are consequences arising from a production process, inventory relating to stock inventory, lead time and capital investment for supplies. This study aims to analyze the problem of physical decline caused by the unavailability of equipment availability of spare parts and long delivery times. This research is descriptive analytical describe the reality on the object studied objectively with emphasis on the variable availability of tools to be ready to operate, category breakdown caused by waiting for spare parts, and Lead Time delivery of spare parts. whereas the method used is to classify parts (stock class) further implement EOQ and JIT methods. This method is a strategy and calculations are performed to determine the number of spare parts that must be economical in order and when the time ordering, while JIT generates an inventory strategy that eliminates lead time and minimize the initial investment capital stock with cooperation with suppliers and OEMs, so the service level suppliers be good. Keywords: JIT, EOQ, Lead Time, Stock Class, Service Level.

Item Type: Thesis (S2)
Call Number CD: CDT-551-15-239
NIM/NIDN Creators: 55111110286
Uncontrolled Keywords: JIT, EOQ, Lead Time, Stock Class, Service Level. MPO, MANAJEMEN OPERASIONAL
Subjects: 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum
Divisions: Pascasarjana > Magister Manajemen
Depositing User: RIA SYAFITRI
Date Deposited: 06 Jul 2022 03:24
Last Modified: 06 Jul 2022 03:24
URI: http://repository.mercubuana.ac.id/id/eprint/64548

Actions (login required)

View Item View Item