ANALISA PROJECT COST VARIANCE PADA PEKERJAAN PRESSURE VESSEL DI PERUSAHAAN JASA INSPEKSI DAN SERTIFIKASI

PRATIWI, JULIYANTI (2018) ANALISA PROJECT COST VARIANCE PADA PEKERJAAN PRESSURE VESSEL DI PERUSAHAAN JASA INSPEKSI DAN SERTIFIKASI. S1 thesis, Universitas Mercu Buana Bekasi.

[img]
Preview
Text
1. HALAMAN JUDUL.pdf

Download (173kB) | Preview
[img]
Preview
Text
2. ABSTRAK.pdf

Download (167kB) | Preview
[img]
Preview
Text
3. SURAT PENYATAAN.pdf

Download (743kB) | Preview
[img]
Preview
Text
4. LEMBAR PENGESAHAN.pdf

Download (6MB) | Preview
[img]
Preview
Text
5. KATA PENGANTAR.pdf

Download (203kB) | Preview
[img]
Preview
Text
6. DAFTAR ISI.pdf

Download (164kB) | Preview
[img]
Preview
Text
7. DAFTAR TABEL.pdf

Download (160kB) | Preview
[img] Text
8. BAB 1.pdf
Restricted to Registered users only

Download (169kB)
[img] Text
9. BAB 2.pdf
Restricted to Registered users only

Download (313kB)
[img] Text
10. BAB 3.pdf
Restricted to Registered users only

Download (303kB)
[img] Text
11. BAB 4.pdf
Restricted to Registered users only

Download (445kB)
[img] Text
12. BAB 5.pdf
Restricted to Registered users only

Download (172kB)
[img] Text
13. BAB 6.pdf
Restricted to Registered users only

Download (163kB)
[img] Text
14. DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (24kB)

Abstract

ABSTRAK Di Indonesia saat ini perkembangan industri minyak dan gas (migas) sangat besar. Perusahaan yang bergerak dalam bidang industri migas, di samping high technology dan high cost, juga mempunyai tingkat risiko (high risks) kecelakaan kerja yang lebih tinggi. Pada peraturan Keputusan Dirjen Migas No. 84K tahun 1998, disebutkan bahwa setiap peralatan harus diinspeksi setiap 3 tahun sekali dan setiap instalasi diinspeksi setiap 5 tahun sekali. Perusahaan Inspeksi adalah perusahaan jasa yang membantu melakukan pemeriksaan teknis dalam rangka menjamin keselamatan usaha migas, baik keselamatan instalasi maupun peralatan. Berdasarkan Permen Nomor 38 ini, Perusahaan Inspeksi bersifat independen dan ditunjuk langsung oleh badan usaha (BU) atau bentuk usaha tetap (BUT). Proyek inspeksi teknik dan sertifikasi pada Perusahaan Jasa Inspeksi Teknik memerlukan manajemen biaya proyek yang efektif. Pelaksanaan proyek aktualnya sering terjadi cost variance. Penelitian ini berfokus dengan biaya aktual proyek pada pekerjaan Pressure Vessel Project 049-02 dengan menghitung nilai CV setiap biaya dan mengetahui pada biaya mana CV sering terjadi. Pada proyek PV 49-02 ditemukan adanya overrun pada kumulatif keselurahan biaya Standard Operational Cost dan Advance Cost. Pada analisa variance cost untuk Standard Operational cost (allowance dan accommodation) ditemukan nilai negatif dengan kumulatif sebesar Rp 4.050.000,- dan nilai persentase kumulatif sebesar 87%. Nilai cost performance index kumulatif sebesar 0,53. Pada analisa variance cost untuk Advance Cost (rent car, BBM, airport ticket, transport bandara) ditemukan ada 3 biaya yang memiliki nilai negatif pada variance cost yaitu rent car, aiport ticket, dan jasa bongkar PSV dengan masing-masing nilai yang didapat yaitu negatif sehingga kumulatif untuk variance cost nya negatif Rp 1.509.000,- ; persentase variance cost 17% dan kumulatif cost perfomance index yaitu 0,87. Kata kunci : Analisis Cost Variance, Project Pressure Vessel, Manajemen Biaya Proyek ABSTRACT Current developments in Indonesia's oil and gas industry (oil and gas) is very large. Companies engaged in the field of oil & gas industry, in addition to high technology and high cost, also have levels of risk (high risks) work accident higher. On the regulation of oil and gas Director General Decision No. 84K of the year 1998, mentioned that each piece of equipment must be inspected every 3 years and each installation inspected every 5 years. The inspection Company is a service company that helps conduct a technical inspection in order to guarantee the safety of oil and gas ventures, both the safety of the installations or equipment. Based on this Number 38, Candy Companies are independent Inspection and was appointed directly by the business entity (BU) or fixed (BUT) efforts. Project Engineering inspection and certification at the engineering Inspection services company require effective project management costs. The actual common project implementation cost variance. This research focus with the actual cost of the project on the work of the Pressure Vessel Project 049-02 by calculating the value of CV every cost and find out on which cost CV often occur. 49-02 PV project found the existence of the overrun on the cumulative cost of the children's Standard Operational Cost and Advance Cost. On analysis of variance cost for Standard Operational cost (allowance and accommodation) found negative values with a cumulative of $4,050,000 percentage value,-and cumulative of 87%. The value of cost performance index cumulative of 0.53. On analysis of variance cost to Advance Cost (rent car, fuel, airport ticket, airport transport) found there are 3 charges that have negative values at variance cost i.e., rent car, aiport ticket unloading services, and PSV with each value obtained i.e. negative cost variance for cumulative so that his negative Rp 1,509,000,-; percentage of variance cost 17% and cumulative cost perfomance index that is 0.87. Keywords: Cost analysis of Variance, Project a Pressure Vessel, the management of project cost

Item Type: Thesis (S1)
Call Number CD: FT/IND 18 010
NIM/NIDN Creators: 41616320082
Uncontrolled Keywords: Kata kunci : Analisis Cost Variance, Project Pressure Vessel, Manajemen Biaya Proyek
Subjects: 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.4 Executive Management/Manajemen Eksekutif
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: siti maisyaroh
Date Deposited: 14 Jun 2022 05:29
Last Modified: 14 Jun 2022 05:29
URI: http://repository.mercubuana.ac.id/id/eprint/63283

Actions (login required)

View Item View Item