IMPLEMENTASI DESIGN JARINGAN FIBER TO THE HOME(FTTH) DENGAN MENGGUNAKAN TEKNOLOGI GIGABIT PASSIVE OPTICALNETWORK (GPON) DI AREA KELURAHAN SLIPI

YULIARTO, MUHAMMAD NUR TRI (2020) IMPLEMENTASI DESIGN JARINGAN FIBER TO THE HOME(FTTH) DENGAN MENGGUNAKAN TEKNOLOGI GIGABIT PASSIVE OPTICALNETWORK (GPON) DI AREA KELURAHAN SLIPI. S1 thesis, Universitas Mercu Buana Bekasi.

[img]
Preview
Text
1. Halaman Judul.pdf

Download (98kB) | Preview
[img]
Preview
Text
2. Abstrak.pdf

Download (128kB) | Preview
[img]
Preview
Text
4. Lembar Pengesahan.pdf

Download (509kB) | Preview
[img]
Preview
Text
5. Kata Pengantar.pdf

Download (87kB) | Preview
[img]
Preview
Text
6. Daftar Isi.pdf

Download (115kB) | Preview
[img]
Preview
Text
3. Lembar Pernyataan.pdf

Download (6MB) | Preview
[img]
Preview
Text
7. Daftar Gambar.pdf

Download (105kB) | Preview
[img]
Preview
Text
8. Daftar Tabel.pdf

Download (75kB) | Preview
[img] Text
9. BAB 1.pdf
Restricted to Registered users only

Download (465kB)
[img] Text
10. BAB 2.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
11. BAB III.pdf
Restricted to Registered users only

Download (614kB)
[img] Text
12. BAB IV.pdf
Restricted to Registered users only

Download (532kB)
[img] Text
13. BAB V.pdf
Restricted to Registered users only

Download (115kB)
[img] Text
14. Daftar Pustaka.pdf
Restricted to Registered users only

Download (112kB)

Abstract

ABSTRAK Implementasi desain jaringan fiber to the home (FTTH) berbasis Gigabit PassiveOptical Network (GPON) di area kelurahan Slipi dilakukan dengancaramelaksanakan survey untuk kemudian melakukan desain jalur kabel fiber optikmenggunakan software google earth termasuk penempatan perangkat yangakandigunakan. Penerapan desain as plan dapat berubah dalam proses pembangunan infrastruktur karena faktor lapangan. Desain yang telah sesuai dengan infrastruktur yangdibangun merupakan As build jaringan FTTH kelurahan slipi. Pada jaringan FTTH kelurahan Slipi total ODP yang terbangun adalah 25ODPdengan menggunakan ODP 1:16 maka total homepass yang terbangun adalah400hp. Jaringan infrastruktur FTTH yang sudah terbangun harus melalui prosesAcceptance Test Procedure (ATP) agar layak untuk didistribusikan kepadacustomer. Dalam proses ATP jaringan FTTH GPON kelurahan Slipi ditemukan 3 buahODPyang memiliki nilai sinyal yang tidak memenuhi standar yakni <-25dBm. AdapunODP tersebut adalah SLP 110301 -26,1 dBm, SLP 110502 output sinyal loss dan110603 output sinyal -28,8dBm. Namun setelah dilakukan perbaikan denganmelakukan analisa pada link budget didapatkan nilai sinyal yang sesuai pada SLP110301 menjadi -22,2dBm pada SLP 110502 nilainya menjadi -23,2dBmdanpada SLP 110603 menjadi -21,0dBm. Kata kunci : Acceptance Test Procedure, FTTH, GPON, Link Budget, ODP ABSTRACT The implementation of Gigabit Passive Optical Network (GPON) based fiber tothe home (FTTH) network design in the Slipi sub-district area was carried out byconducting a survey to then design the fiber optic cable path using Google Earthsoftware including the placement of devices to be used. The as plan design can change in the process of infrastructure development duetofield factors. The design that has been in accordance with the infrastructure that was built is an As build FTTH slipi village network. In the Slipi sub-district FTTH network, the total ODP built is 25 ODP usingODP1:16, so the total homepass built is 400hp. FTTH infrastructure network that hasbeen built must go through the Acceptance Test Procedure (ATP) process tobefeasible to distribute to customers. In the ATP process of FTTH GPON Slipi sub-district, 3 ODPs were foundthat had a signal value that did not meet the standard of <-25dBm. The ODPis SLP110301 with value signal -26.1 dBm, SLP 110502 output signal loss and 110603signal output -28.8 dBm. However, after making improvements by analyzingthelink budget, the corresponding signal value of SLP 110301 becomes -22.2dBmonSLP 110502, the value becomes -23.2dBm and at SLP 110603 it becomes-21.0dBm. Keywords: Acceptance Test Procedure, FTTH, GPON, Link Budget, ODP

Item Type: Thesis (S1)
Call Number CD: FT/ELK 20 007
NIM/NIDN Creators: 41417310028
Uncontrolled Keywords: Kata kunci : Acceptance Test Procedure, FTTH, GPON, Link Budget, ODP
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 621 Applied Physics/Fisika terapan > 621.3 Electrical Engineering, Lighting, Superconductivity, Magnetic Engineering, Applied Optics, Paraphotic Technology, Electronics Communications Engineering, Computers/Teknik Elektro, Pencahayaan, Superkonduktivitas, Teknik Magnetik, Optik Terapan, Tekn
Divisions: Fakultas Teknik > Teknik Elektro
Depositing User: siti maisyaroh
Date Deposited: 25 May 2022 03:38
Last Modified: 25 May 2022 03:38
URI: http://repository.mercubuana.ac.id/id/eprint/61797

Actions (login required)

View Item View Item