WOTO, WOTO (2016) ANALISA WAKTU SIKLUS dan TAKT TIME pada ASSEMBLY ENGINE MOTOR MATIC di PT.Astra Honda Motor PLANT 1 SUNTER. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
COVER.pdf Download (561kB) | Preview |
|
Text (BAB I)
BAB I.pdf Restricted to Registered users only Download (267kB) |
||
Text (BAB II)
BAB II.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB III)
BAB III.pdf Restricted to Registered users only Download (703kB) |
||
Text (BAB IV)
BAB IV.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
BAB V.pdf Restricted to Registered users only Download (8kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (250kB) |
Abstract
ANALISA WAKTU SIKLUS dan TAKT TIME pada ASSEMBLY ENGINE MOTOR MATIC di PT.Astra Honda Motor PLANT 1 SUNTER
Item Type: | Thesis (S1) |
---|---|
NIM/NIDN Creators: | 41613010046 |
Uncontrolled Keywords: | ANALISA WAKTU SIKLUS, TAKT TIME, ASSEMBLY ENGINE MOTOR MATIC, PT.Astra Honda Motor PLANT 1 SUNTER |
Subjects: | 700 Arts/Seni, Seni Rupa, Kesenian > 710 Civic and Lanscape Art/Seni Perkotaan dan Pertamanan > 711 Area Planning/Perencanaan Wilayah Perkotaan dan Pertamanan > 711.7 Plans for Transportation Facilities/Perencanaan untuk Fasilitas Transportasi > 711.73 Motor Vehicle Transportation Facilities/Fasilitas Kendaraan Motor 700 Arts/Seni, Seni Rupa, Kesenian > 750 Painting and Paintings/Seni Lukis dan Lukisan > 758 Other Subjects/Subjel Lainnya > 758.6 Industrial and Technical Subjects/Subjek Industri dan Teknik |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 16 Feb 2017 12:26 |
Last Modified: | 02 Sep 2024 07:07 |
URI: | http://repository.mercubuana.ac.id/id/eprint/6065 |
Actions (login required)
View Item |