SAPUTRA, YOGA ADI (2020) ANALISIS PERENCANAAN DAN PENGENDALIAN PERSEDIAAN BAHAN BAKU PRODUK PIX-MV DENGAN METODE PERAMALAN DAN MATERIAL REQUIREMENT PLANNING DI PT. KHEI. S1 thesis, Universitas Mercu Buana Bekasi.
|
Text
1. Halaman Judul.pdf Download (46kB) | Preview |
|
|
Text
2. Abstrak.pdf Download (57kB) | Preview |
|
|
Text
3. Surat Pernyataan Originalitas (Scan).pdf Download (97kB) | Preview |
|
|
Text
4. Lembar Pengesahan (Scan).pdf Download (95kB) | Preview |
|
|
Text
5. Kata Pengantar.pdf Download (110kB) | Preview |
|
|
Text
6. Daftar Isi.pdf Download (97kB) | Preview |
|
|
Text
7. Daftar Tabel.pdf Download (90kB) | Preview |
|
|
Text
8. Daftar Gambar.pdf Download (79kB) | Preview |
|
|
Text
9. Daftar Lampiran.pdf Download (36kB) | Preview |
|
Text
10. BAB I.pdf Restricted to Registered users only Download (156kB) |
||
Text
11. BAB II.pdf Restricted to Registered users only Download (508kB) |
||
Text
12. BAB III.pdf Restricted to Registered users only Download (144kB) |
||
Text
13. BAB IV.pdf Restricted to Registered users only Download (668kB) |
||
Text
14. BAB V.pdf Restricted to Registered users only Download (103kB) |
||
Text
15. BAB VI.pdf Restricted to Registered users only Download (67kB) |
||
Text
16. Daftar Pustaka.pdf Restricted to Registered users only Download (119kB) |
||
Text
17. Lampiran.pdf Restricted to Registered users only Download (83kB) |
Abstract
ABSTRAK PT. KHEI adalah sebuah perusahaan manufaktur di bidang komponen panel listrik. PIX-MV adalah produk dengan permintaan paling banyak. Produk ini memiliki tiga bahan baku yaitu, plat GLVM-2, plat SGHC-3 dan flat head rivet. Permasalahan yang terjadi di PT. KHEI adalah terjadinya kekurangan bahan baku karena perencanaan dan pengendalian bahan baku yang kurang tepat. Di tahun 2019 terdapat kekurangan bahan baku di bulan Maret, Oktober dan November karena lonjakan permintaan sekitar 60% lebih besar dari bulan sebelumnya. Penelitian ini bertujuan untuk merencanakan dan mengendalikan tingkat persediaan di PT. KHEI yang optimal dengan meramalkan permintaan selama periode 1 tahun ke depan dan membuat pengendalian persediaannya. Metode peramalan yang digunakan adalah multiplicative decomposition, holt winters multiplicative dan linear trend with seasonality. Hasil dari penelitian ini menunjukkan bahwa metode multiplicative decomposition dipilih karena memiliki nilai kesalahan terkecil dan masih dalam batas kendali moving range. Sedangkan untuk metode lot sizing material requirement planning yang digunakan yaitu part period balancing, silver meal algorithm dan wagner whitin algorithm. Metode wagner whitin algorithm yang dipilih untuk digunakan karena memiliki total biaya persediaan terendah, yaitu Rp 91.687.280, kemudian di urutan kedua adalah silver meal algorithm dengan total biaya Rp 91.867.280 dan di urutan terakhir adalah part period balancing yang total biaya persediaannya sebesar Rp 95.992.280. Kata kunci: persediaan, peramalan, material requirement planning (MRP), lot sizing ABSTRACT PT. KHEI is a manufacturing company in the field of electrical panel components. PIX-MV is the product with the most demand. This product has three raw materials, namely, GLVM-2 plate, SGHC-3 plate and flat head rivet. The problems that occurred at PT. KHEI is the occurrence of a shortage of raw materials due to improper planning and control of raw materials. In 2019 there was a shortage of raw materials in March, October and November as the demand jump was about 60% bigger than the previous month. This study aims to plan and control the level of inventory at PT. KHEI is optimal by predicting demand for the next 1 year period and controlling its inventory. The forecasting methods used are multiplicative decomposition, holt winters multiplicative and linear trend with seasonality. The results of this study indicate that the multiplicative decomposition method was chosen because it has the smallest error value and is still within the moving range control limits. Meanwhile, the lot sizing material requirement planning method used is part period balancing, silver meal algorithm and wagner whitin algorithm. The Wagner Whitin algorithm method was chosen because it has the lowest total inventory cost, which is Rp. 91,687,280, then in second place is the silver meal algorithm with a total cost of Rp. 91,867,280 and in the last order is part period balancing with a total inventory cost of Rp. 95,992,280. Keywords: inventory, forecasting, material requirements planning (MRP), lot sizing
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND 20 040 |
NIM/NIDN Creators: | 41616310079 |
Uncontrolled Keywords: | Kata kunci: persediaan, peramalan, material requirement planning (MRP), lot sizing |
Subjects: | 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.5 Management of Production/Manajemen Produksi |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | siti maisyaroh |
Date Deposited: | 21 Apr 2022 05:55 |
Last Modified: | 21 Apr 2022 05:55 |
URI: | http://repository.mercubuana.ac.id/id/eprint/60332 |
Actions (login required)
View Item |