ANALISIS PEMILIHAN PENGGUNAAN BEKISTING BAJA PADA PIER TERHADAP BIAYA DAN WAKTU PELAKSANAAN PADA PROYEK LIGHT RAIL TRANSIT LINTAS CAWANG – DUKUH ATAS

RAHMANSYAH, ARIEF (2021) ANALISIS PEMILIHAN PENGGUNAAN BEKISTING BAJA PADA PIER TERHADAP BIAYA DAN WAKTU PELAKSANAAN PADA PROYEK LIGHT RAIL TRANSIT LINTAS CAWANG – DUKUH ATAS. S1-Sarjana thesis, Universitas Mercu Buana Jatisampurna.

[img]
Preview
Text
1. Cover.pdf

Download (63kB) | Preview
[img]
Preview
Text
2. Lembar Pengesahan.pdf

Download (204kB) | Preview
[img]
Preview
Text
3. Lembar Pernyataan.pdf

Download (119kB) | Preview
[img]
Preview
Text
4. abstrak.pdf

Download (214kB) | Preview
[img]
Preview
Text
5. KATA PENGANTAR.pdf

Download (151kB) | Preview
[img]
Preview
Text
6. DAFTAR ISI.pdf

Download (77kB) | Preview
[img]
Preview
Text
7. DAFTAR TABEL.pdf

Download (71kB) | Preview
[img]
Preview
Text
8. DAFTAR GAMBAR.pdf

Download (143kB) | Preview
[img]
Preview
Text
9. DAFTAR LAMPIRAN.pdf

Download (21kB) | Preview
[img] Text
10. BAB I.pdf
Restricted to Registered users only

Download (282kB)
[img] Text
11. BAB II.pdf
Restricted to Registered users only

Download (584kB)
[img] Text
12. BAB III.pdf
Restricted to Registered users only

Download (652kB)
[img] Text
13. BAB IV.pdf
Restricted to Registered users only

Download (476kB)
[img] Text
14. BAB V.pdf
Restricted to Registered users only

Download (238kB)
[img] Text
15. DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (148kB)
[img] Text
16. LAMPIRAN.pdf
Restricted to Registered users only

Download (681kB)

Abstract

ABSTRAK Pembangunan infrastruktur layang diperlukan struktur yang kuat. Dalam perencanaannya komponen-komponen struktur harus mempertimbangkan factor keamanan, kekuatan, kestabilan, kekakuan, keawetan, dan fungsi dari suatu infrastruktur laying sehingga memenuhi kriteria perancangan. Proyek yang sukses berarti proyek yang dilaksanakan sesuai biaya, jadwal, dan keberhasilan mencapai sasaran teknis. Tujuan dari penelitian ini adalah untuk mencari pemilihan penggunaan bekisting yang lebih efisien dari segi biaya dan waktu. Penelitian ini menggunakan metode penelitian analitik kuantitatif, yaitu penelitian menggunakan data berupa angka sebagai alat menganalisis biaya dan waktu pelaksanaan penggunaan bekisting. Hasil analisis biaya dan waktu dalam pelaksanaan bekisting menggunakan material baja dan kayu adalah bekisting baja dapat mengurangi waktu pelaksanaan 43-50% dari waktu yang dibutuhkan pekerjaan menggunakan bekisting kayu. Dan bekisting baja dapat mengurangi biaya 18,4% atau Rp. 2.082.260.687,20 dari penggunaan material bekisting kayu. Kata kunci : perbandingan biaya dan waktu, bekisting baja dan kayu ABSTRACT The construction of flyover infrastructure requires a strong structure. In planning the structural components must consider the safety, strength, stability, stiffness, durability, and function of a flyover infrastructure so that it meets the design criteria Successful projects mean that projects are carried out according to cost, schedule, and success in achieving technical objectives. The purpose of this study is to find the choice of using formwork that is more efficient in terms of cost and time. This study uses quantitative analytical research methods, which means that research uses data in the form of numbers as a tool to analyze the costs and timing of using formwork. The results of the analysis of costs and time in the implementation of formwork using steel and wood materials is that steel formwork can reduce the implementation time of 43-50% of the time needed for work using wood formwork. And steel formwork can reduce costs by 18.4% or Rp. 2,082,260,687.20 from the use of wood formwork materials. Keywords : comparison of costs and time, steel formwork and wood formwork

Item Type: Thesis (S1-Sarjana)
Call Number CD: FT/SIP 19 026
NIM: 41117320072
Uncontrolled Keywords: perbandingan biaya dan waktu, bekisting baja dan kayu
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Nasruddin Mansyur S.Hum
Date Deposited: 15 Jan 2021 03:47
Last Modified: 15 Jan 2021 03:47
URI: http://repository.mercubuana.ac.id/id/eprint/59142

Actions (login required)

View Item View Item