DHARMAWAN, MOHAMAD DWIKY (2019) ANALISIS PENINGKATAN EFISIENSI DAN KESEIMBANGAN LINTASAN PRODUKSI UNTUK MENGURANGI WAKTU MENUNGGU DAN BOTTLENECK PADA LINE A HPM WELDING PLANT 2 (Studi Kasus pada PT Metindo Erasakti). S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
1. JUDUL COVER.pdf Download (166kB) | Preview |
|
|
Text (ABSTRAK)
4. ABSTRAK.pdf Download (242kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
2. LEMBAR PERNYATAAN.pdf Download (223kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
3. LEMBAR PENGESAHAN.pdf Download (225kB) | Preview |
|
|
Text (KATA PENGANTAR)
5. KATA PENGANTAR.pdf Download (163kB) | Preview |
|
|
Text (DAFTAR ISI)
6. DAFTAR ISI.pdf Download (235kB) | Preview |
|
|
Text (DAFTAR TABELDAFTAR GAMBAR)
7. DAFTAR TABEL.pdf Download (162kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
8. DAFTAR GAMBAR.pdf Download (160kB) | Preview |
|
Text (BAB I)
9. BAB 1.pdf Restricted to Registered users only Download (232kB) |
||
Text (BAB II)
10. BAB 2.pdf Restricted to Registered users only Download (371kB) |
||
Text (BAB III)
11. BAB 3.pdf Restricted to Registered users only Download (401kB) |
||
Text (BAB IV)
12. BAB 4.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
13. BAB 5.pdf Restricted to Registered users only Download (606kB) |
||
Text (BAB VI)
14. BAB 6.pdf Restricted to Registered users only Download (206kB) |
||
Text (DAFTAR PUSTAKA)
15. DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (215kB) |
Abstract
The balance at the work station functions as an output system to create efficiency. The advantage of line balancing is to equal the distribution of tasks so that idle time from production line or material buildup can be avoided. PT Metindo Erasakti is a company engaged in the automotive component industry which is incorporated in the Astra Otopart Group. In this research, we will discuss the line balancing on production line A HPM welding plant 2 by using two methods, namely Largest Candidate Rules (LCR) and Ranked Positioned Weight (RPW), where the line efficiency, Idle Time, and Smoothness Index at the initial state of each respectively 67%, 13.98 minutes, and 5.14. after making improvement with the 2 methods used it was found that using the LCR method the line efficiency increased to 83%, Idle Time decreased to 5.54 minutes, and the smoothness index became 2.63, whereas with the RPW method the line efficiency increased to 82%, Idle Time decreased to 6.24 minutes and the Smoothness Index to 2.85. Then obtained the best method is the LCR method with a line efficiency of 83%, Idle Time 5.54 minutes, and smoothness index 2.63. Keywords: Line balancing, efficiency, idle time, smoothness index Keseimbangan pada stasiun kerja berfungsi sebagai sistem keluaran untuk menciptakan keefisienan. Keuntungan keseimbangan lintasan adalah pembagian tugas secara merata sehingga waktu menunggu dari lintasan produksi atau penumpukan material bisa dihindari. PT Metindo Erasakti adalah sebuah perusahaan yang bergerak di bidang industri komponen otomotif yang tergabung dalam Astra Otopart Group. Dalam penelitian kali ini yang akan membahas keseimbangan lintasan pada line A HPM welding plant 2 dengan menggunakan dua metode yaitu Largest Candidate Rules (LCR) dan Ranked Positioned Weight (RPW), dimana efisiensi lintasan, Idle Time, dan Smoothness Index pada keadaan awal masing-masing adalah 67%, 13.98 menit, dan 5,14. setelah melakukan usulan perbaikan dengan 2 metode yang digunakan didapatkan menggunakan metode LCR efisiensi lintasan meningkat menjadi 83%, Idle Time menurun menjadi 5,54 menit, dan smoothness index menjadi 2,63, sedangkan dengan metode RPW didapatkan efisiensi lintasan meningkat menjadi 82%, Idle Time menurun menjadi 6,24 menit dan Smoothness Index menjadi 2,85. Maka diperoleh metode terbaik adalah metode LCR dengan efisiensi lintasan 83%, Idle Time 5,54 menit, dan smoothness index 2,63. Kata Kunci : Keseimbangan lintasan, efisiensi, idle time, Smoothness Index
Actions (login required)
View Item |