IDENTIFIKASI RISIKO PELAKSANAAN PEKERJAAN KONSTRUKSI PADA PROYEK GEDUNG BERTINGKAT (Studi Kasus Proyek Pembangunan Apartemen Green Cleosa)

RODIYATNO, RIZAL (2020) IDENTIFIKASI RISIKO PELAKSANAAN PEKERJAAN KONSTRUKSI PADA PROYEK GEDUNG BERTINGKAT (Studi Kasus Proyek Pembangunan Apartemen Green Cleosa). S1-Sarjana thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
1. Halaman Judul.pdf

Download (35kB) | Preview
[img]
Preview
Text (ABSTRAK)
2. Abstrak.pdf

Download (75kB) | Preview
[img]
Preview
Text (LEMBAR PERNYATAAN)
3. Surat Pernyataan.pdf

Download (553kB) | Preview
[img]
Preview
Text (LEMBAR PENGESAHAN)
4. Lembar Pengesahan.pdf

Download (531kB) | Preview
[img]
Preview
Text (KATA PENGANTAR)
5. Kata Pengantar.pdf

Download (73kB) | Preview
[img]
Preview
Text (DAFTAR ISI)
6. Daftar Isi.pdf

Download (34kB) | Preview
[img]
Preview
Text (DAFTAR TABEL)
7. Daftar tabel.pdf

Download (65kB) | Preview
[img]
Preview
Text (DAFTAR GAMBAR)
8. Daftar gambar.pdf

Download (60kB) | Preview
[img]
Preview
Text (DAFTAR LAMPIRAN)
9. Daftar Lampiran.pdf

Download (22kB) | Preview
[img] Text (BAB I)
10. BAB I.pdf
Restricted to Registered users only

Download (89kB)
[img] Text (BAB II)
11. BAB II.pdf
Restricted to Registered users only

Download (277kB)
[img] Text (BAB III)
12. BAB III.pdf
Restricted to Registered users only

Download (546kB)
[img] Text (BAB IV)
13. BAB IV.pdf
Restricted to Registered users only

Download (778kB)
[img] Text (BAB V)
14. BAB V.pdf
Restricted to Registered users only

Download (69kB)
[img] Text (DAFTAR PUSTAKA)
15. Daftar Pustaka.pdf
Restricted to Registered users only

Download (107kB)
[img] Text (LAMPIRAN)
16. Lampiran.pdf
Restricted to Registered users only

Download (331kB)

Abstract

Title : Risk Identification of the Implementation of Construction Work in Multi-storey Building Projects (Case Study of the Green Cleosa Cileduk Apartment Development Project, Tangerang), Name : Rizal Rodiyatno, Nim : 41114110066, Advisor : Ir. Ernanda Dharmapribadi, MM, 2019 The building construction project is said to be one of the high-risk projects given the large weight of work and the high structure to be built. Each construction project has its own uniqueness, especially with the problems and risks faced. One of the causes of disruption in construction project performance is the work that allows risk to occur and has a negative impact on project performance during construction. The research study was conducted on the construction project of Green Cleosa Apartment - Cileduk - Tangerang. and research time is approximately 4 months, starting in March - June 2019. From the results of the analysis of calculations with the probability x impact method for each category of risk factors, the results have been obtained in the form of a risk rating. Based on the results of the process of ranking analysis and risk mapping it is known that 28 variables are classified as Moderate risk and 5 variables are classified as Low risk. Then the factors that have a high risk to cost performance, quality, time. The highest rating in the category of procurement of tools and materials is Damage to tools, property, physical projects with a score of 6.54, the category of formwork work namely design changes during construction with a score of 6.56, the category of pembesian work ie Error understanding of working drawings with a score of 6.65, and the category of foundry work is concrete care after casting which is not noticed with a score of 6.32. Of the four risk variables above are classified as Moderate risk. After obtaining the risk classified as moderate risk, it is validated again with experts to emphasize that risk is a risk that is a big risk to the construction of the structure of the Green Cleosa Apartment - Cileduk - Tangerang. Keywords : Risk Identification, Implementation, Construction, Multi-storey building, Green Cleosa Apartments Title : Risk Identification of the Implementation of Construction Work in Multi-storey Building Projects (Case Study of the Green Cleosa Cileduk Apartment Development Project, Tangerang), Name : Rizal Rodiyatno, Nim : 41114110066, Advisor : Ir. Ernanda Dharmapribadi, MM, 2019 The building construction project is said to be one of the high-risk projects given the large weight of work and the high structure to be built. Each construction project has its own uniqueness, especially with the problems and risks faced. One of the causes of disruption in construction project performance is the work that allows risk to occur and has a negative impact on project performance during construction. The research study was conducted on the construction project of Green Cleosa Apartment - Cileduk - Tangerang. and research time is approximately 4 months, starting in March - June 2019. From the results of the analysis of calculations with the probability x impact method for each category of risk factors, the results have been obtained in the form of a risk rating. Based on the results of the process of ranking analysis and risk mapping it is known that 28 variables are classified as Moderate risk and 5 variables are classified as Low risk. Then the factors that have a high risk to cost performance, quality, time. The highest rating in the category of procurement of tools and materials is Damage to tools, property, physical projects with a score of 6.54, the category of formwork work namely design changes during construction with a score of 6.56, the category of pembesian work ie Error understanding of working drawings with a score of 6.65, and the category of foundry work is concrete care after casting which is not noticed with a score of 6.32. Of the four risk variables above are classified as Moderate risk. After obtaining the risk classified as moderate risk, it is validated again with experts to emphasize that risk is a risk that is a big risk to the construction of the structure of the Green Cleosa Apartment - Cileduk - Tangerang. Keywords : Risk Identification, Implementation, Construction, Multi-storey building, Green Cleosa Apartments

Item Type: Thesis (S1-Sarjana)
Call Number: ST/11/19/218
NIM: 41114110066
Uncontrolled Keywords: Risk Identification, Implementation, Construction, Multi-storey building, Green Cleosa Apartments
Subjects: 000 Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 060 General Organizations, Foundations, and Museology/Organisasi-organisasi Umum, dan Museologi > 069 Museology (Museum science)/Museologi > 069.2 Museum Management and Use of Physical Plant/Manajemen Museum > 069.22 Planning for Buildings/Merencanakan Bangunan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil > 624.9 Building, Structure, and Installation/Bangunan, Struktur, dan Instalasi
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan
600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 690.1-690.9 Standard Subdivisions of Planning, Anaysis, Engineering Design/Subdivisi Standar Dari Perencanaan, Analisa dan Teknik Bangunan
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Dede Muksin Lubis
Date Deposited: 20 Mar 2020 08:57
Last Modified: 20 Mar 2020 08:57
URI: http://repository.mercubuana.ac.id/id/eprint/55305

Actions (login required)

View Item View Item