NURDIYANTO, NURDIYANTO (2019) ANALISA SISTEM SINKRON PLN-GENSET DI RUMAH SAKIT UNIVERSITAS INDONESIA. S1 thesis, Universitas Mercu Buana.
|
Text (HALAMAN COVER)
1. HALAMAN JUDUL.pdf Download (170kB) | Preview |
|
|
Text (ABSTRAK)
4. ABSTRAK.pdf Download (263kB) | Preview |
|
|
Text (ABSTRAK)
5. ABSTRACT.pdf Download (261kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
2. LEMBAR PERNYATAAN.pdf Download (160kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
3. LEMBAR PENGESAHAN.pdf Download (134kB) | Preview |
|
|
Text (KATA PENGANTAR)
6. KATA PENGANTAR.pdf Download (209kB) | Preview |
|
|
Text (DAFTAR ISI)
7. DAFTAR ISI.pdf Download (174kB) | Preview |
|
|
Text (DAFTAR TABEL)
8. DAFTAR TABEL.pdf Download (24kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
9. DAFTAR GAMBAR.pdf Download (209kB) | Preview |
|
|
Text (DAFTAR LAMPIRAN)
16. DAFTAR LAMPIRAN.pdf Download (159kB) | Preview |
|
Text (BAB 1)
10. BAB I.pdf Restricted to Registered users only Download (181kB) |
||
Text (BAB 2)
11. BAB II.pdf Restricted to Registered users only Download (725kB) |
||
Text (BAB 3)
12. BAB III.pdf Restricted to Registered users only Download (434kB) |
||
Text (BAB 4)
13. BAB IV.pdf Restricted to Registered users only Download (426kB) |
||
Text (BAB 5)
14. BAB V.pdf Restricted to Registered users only Download (265kB) |
||
Text (DAFTAR PUSTAKA)
15. DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (163kB) |
||
Text (LAMPIRAN)
LAMPIRAN 1.pdf Restricted to Registered users only Download (729kB) |
||
Text (LAMPIRAN)
LAMPIRAN 2.pdf Restricted to Registered users only Download (231kB) |
Abstract
At the University of Indonesia Hospital project the electricity distribution network system used is the PLN-Genset synchronous system. PLNGenset synchronous system is a system where if there is a disruption or blackout from the PLN, the generator will backup the power source so that all needs can be met. At the University Hospital in Indonesia, there is a problem where generators sometimes experience hunting when there is a backup generator power source process and when load sharing from generator sets to PLN. To overcome this problem, a system modification is carried out so that if there is a disturbance on the genset (hunting) when the load process is sharing / transferring the load from the generator to PLN, all loads can be supplied with a good source of electricity. To modify the system, a control circuit is needed that will integrate with the PLN-Genset synchronous system. Control circuit simulation for system modification using Zeliosoft software succeeded in overcoming the PLN-Genset synchronous system when experiencing genset hunting. This simulation is done in 2 cases, namely when the load sharing process is successful and when the load sharing process fails. The setting parameters entered during this simulation represent the actual conditions when the deepsea alarm module, synchronization between generator sets, CB incoming PLN open, load sharing process. Keywords: synchronous PLN-generator, system modification, load sharing, simualtion Pada proyek Rumah Sakit Universitas Indonesia sistem jaringan distribusi tenaga listrik yang digunakan adalah sistem sinkron PLN-Genset. Sistem sinkron PLN-Genset merupakan sistem dimana jika terdapat gangguan atau pemadaman dari PLN, maka genset akan backup sumber listrik sehingga semua kebutuhan bisa terpenuhi. Di Rumah Sakit Universitas Indonesia ini terdapat masalah dimana genset terkadang mengalami gangguan (hunting) pada saat terjadi proses genset backup sumber listrik dan pada saat pemindahan beban (load sharing) dari genset ke PLN. Untuk mengatasi masalah tersebut maka dilakukan modifikasi sistem agar jika terjadi gangguan pada genset (hunting) pada saat proses load sharing/ pemindahan beban dari genset ke PLN semua beban dapat tersuplai sumber tenaga listrik dengan baik. Untuk melakukan modifikasi sistem, dibutuhkan rangkaian kontrol yang akan berintegrasi dengan sistem sinkron PLN-Genset. Simulasi rangkaian kontrol untuk modifikasi sistem menggunakan software Zeliosoft berhasil untuk mengatasi sistem sinkron PLN-Genset ketika mengalami gangguan (genset hunting). Simulasi ini dilakukan dengan 2 kasus yaitu pada saat proses load sharing sukses dan pada saat proses load sharing gagal. Parameter setting yang dimasukkan pada saat melakukan simulasi ini sudah mewakili kondisi sebenarnya yaitu ketika modul deepsea alarm, sinkronisasi antar genset, CB incoming PLN open, proses load sharing. Kata Kunci: sinkron PLN-Genset, modifkasi sistem, load sharing, simulasi
Actions (login required)
View Item |