PANJAITAN, JANNUS SURYAWAN (2019) ANALISIS RISIKO FAKTOR YANG MEMPENGARUHI KINERJA MUTU PADA PEKERJAAN PONDASI BORED PILE PROYEK JALAN TOL LAYANG. S2 thesis, Universitas Mercu Buana Jakarta.
|
Text (HALAMAN COVER)
1. Halaman Judul.pdf Download (51kB) | Preview |
|
|
Text (ABSTRAK)
2. Abstrak - INA _ Eng.pdf Download (49kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
4. Lembar Pernyataan.pdf Download (88kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
3. Lembar Pengesahan.pdf Download (137kB) | Preview |
|
|
Text (KATA PENGANTAR)
5. KATA PENGANTAR.pdf Download (93kB) | Preview |
|
|
Text (DAFTAR ISI)
6. DAFTAR ISI.pdf Download (84kB) | Preview |
|
|
Text (DAFTAR TABEL)
7. DAFTAR TABEL.pdf Download (31kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
8. DAFTAR GAMBAR.pdf Download (26kB) | Preview |
|
|
Text (DAFTAR LAMPIRAN)
9. DAFTAR LAMPIRAN.pdf Download (24kB) | Preview |
|
Text (BAB 1)
10. BAB 1.pdf Restricted to Registered users only Download (193kB) |
||
Text (BAB 2)
11. BAB 2.pdf Restricted to Registered users only Download (493kB) |
||
Text (BAB 3)
12. BAB 3.pdf Restricted to Registered users only Download (324kB) |
||
Text (BAB 4)
13. BAB 4.pdf Restricted to Registered users only Download (707kB) |
||
Text (BAB 5)
14. BAB 5.pdf Restricted to Registered users only Download (57kB) |
||
Text (DAFTAR PUSTAKA)
15. DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (103kB) |
||
Text (LAMPIRAN)
16. Lampiran.pdf Restricted to Registered users only Download (558kB) |
Abstract
In construction projects, stages of work which affects the objectives of the project are kemelencengan foundation work. The foundation work is vital construction work related to its functions. In order to maintain the quality of the conduct of the foundation work can not be separated from the many obstacles that will arise and often unpredictable. The events can be identified uncertainty into risks that will arise. Risk is a factor that may affect the achievement of objectives resulting in unintended consequences. Risks arise due to the uncertainty and risk impacts affect productivity, achievement, quality and project cost budget. Risks that may occur in the foundation work due to a mismatch in which the quality of the work done to overcome them rework.identify risk variables implementation phase of foundation work bored pile, Assessment of risk weightings by experts and analyzed by the method of analytical hierarchy process (AHP), and determine the level / category of risk impact and frequency of bored pile foundation work. Results from this study that the risk variables on job retention borepile foundation consists of 34 variables and 4 variables that are not valid. The most dominant variable of expert judgment isthe material used is not within specifications with weights 86,81% improper execution method 79,02%, and bad weather 72,50%, these three variables including the level of the high risk category of the analysis results severity index (SI). Keywords: Bore Pile Foundations, Risk Management, Analytic Method hiearchy Process (AHP), Severity Index (SI) Pada proyek konstruksi, tahap pekerjaan yang sangat berpengaruh terhadap kemelencengan sasaran proyek adalah pekerjaan pondasi. Pekerjaan pondasi merupakan pekerjaan konstruksi yang vital terkait dengan fungsinya. Dalam rangka menjaga mutu dari pelaksanan pekerjaan pondasi tersebut tidak terlepas dari banyaknya kendala yang akan muncul dan seringkali tidak dapat diprediksi. Kejadian-kejadian ketidakpastian dapat di identifikasi menjadi risiko yang akan muncul. Risiko adalah faktor yang dapat mempengaruhi pencapaian tujuan sehingga terjadi konsekuensi yang tidak diinginkan. Risiko muncul karena ketidakpastian dan dampak risiko mempengaruhi produktivitas, prestasi, kualitas dan anggaran biaya proyek. Risiko yang mungkin terjadi pada pekerjaan pondasi akibat ketidaksesuaian mutu dimana untuk mengatasinya dilakukan pekerjaan rework. Pada Penelitian ini penulis mengindentifikasi variable-variabel risiko tahap pelaksanaan pekerjaan pondasi bored pile, penilaian bobot risiko oleh pakar dan dianalisis dengan metode analytical hierarchy process (AHP), dan mengetahui tingkat/kategori risiko terhadap dampak dan frekuensi pekerjaan pondasi bored pile. Hasil dari penelitian ini yaitu variabel risiko pada pekerjan pondasi borepile terdiri dari 34 variabel dan 4 variabel yang tidak valid. Variabel yang paling dominan dari penilaian pakar adalah material yang digunakan tidak sesuai spesifikasi dengan bobot 86,81%, metode pelaksanaan tidak tepat 79,02%, dan cuaca kurang baik 72,50 %, tiga variabel ini yang termasuk level kategori risiko tinggi dari hasil analisis severity indeks (SI). Kata Kunci : Pondasi Bore Pile, Manajemen Risiko, Metode Analytic Hiearchy Process (AHP), Severity Indeks (SI)
Actions (login required)
View Item |