ROMADHON, DWI FAJAR (2020) ANALISA PERBAIKAN TANAH RAWA DENGAN MENGGUNAKAN MINIPILE PADA PROYEK JALAN TOL TERBANGGI BESAR-PEMATANG PANGGANG VGF JASAMARGA JAPEK SELATAN. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01. HALAMAN JUDUL.pdf Download (246kB) | Preview |
|
|
Text (ABSTRAK)
02. ABSTRAK.pdf Download (148kB) | Preview |
|
|
Text (LEMBAR PERNYATAAN)
03. LEMBAR PERNYATAAN ASLI.pdf Download (155kB) | Preview |
|
|
Text (LEMBAR PENGESAHAN)
04. LEMBAR PENGESAHAN.pdf Download (175kB) | Preview |
|
|
Text (KATA PENGANTAR)
05. KATA PENGANTAR.pdf Download (335kB) | Preview |
|
|
Text (DAFTAR ISI)
06. DAFTAR ISI.pdf Download (111kB) | Preview |
|
|
Text (DAFTAR TABEL)
07. DAFTAR TABEL.pdf Download (308kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
08. DAFTAR GAMBAR.pdf Download (374kB) | Preview |
|
|
Text (DAFTAR LAMPIRAN)
09. DAFTAR LAMPIRAN.pdf Download (355kB) | Preview |
|
Text (BAB I)
10. BAB 1 - PENDAHULUAN.pdf Restricted to Registered users only Download (498kB) |
||
Text (BAB II)
11. BAB 2 - TINJAUAN PUSTAKA.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB III)
12. BAB 3 - METODOLOGI PENELITIAN.pdf Restricted to Registered users only Download (944kB) |
||
Text (BAB IV)
13. BAB 4 - HASIL DAN ANALISIS.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
14. BAB 5 - PENUTUP.pdf Restricted to Registered users only Download (555kB) |
||
Text (AFTAR PUSTAKA)
15. DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (285kB) |
||
Text (LAMPIRAN)
16. LAMPIRAN.pdf Restricted to Registered users only Download (4MB) |
Abstract
Based on the results of the preliminary survey, soil in the project in the form of soft soil resulted in not optimal work and soil repairs should be done. Of the several methods of repairing the soil, the reinforcement method is taken, namely the method by making a minipile to get the land according to the criteria. The study was carried out by calculating the carrying capacity of a single pile consisting of analysis of capacity on the pile blanket and capacity at the end of the pile and analysis of the carrying capacity of the pile groups. Also carried out the calculation of the analysis of soil subsidence and pile reduction. From the analysis results obtained the value fs = 323.33 kN, qn = 187.50 kN, Qult = 509.83 kN, Eg = 0.66, Qg = 35944. Whereas for soil subsidence at 0-2 m = 0.048 m, 2-3 m = 0.074 m. Calculation of decrease in single pile Se = 0.035 m and consolidation decrease = 0.000001 m. Keywords : Soft soil, Minipile, Carrying capacity of poles, Land subsidence Berdasarkan hasil survey pendahuluan, tanah yang berada di proyek berupa tanah lunak mengakibatkan pekerjaan tidak maksimal dan harus dilakukan perbaikan tanah. Dari beberapa metode perbaiakn tanah diambillah metode perkuatan, yaitu metode dengan melakukan pemancangan minipile untuk mendapatkan tanah sesuai dengan kriteria. Kajian dilakukan dengan cara menghitung daya dukung tiang tunggal yang terdiri dari analisa kapasitas pada selimut tiang dan kapasitas pada ujung tiang dan analisa daya dukung tiang kelompok. Juga dilakukan perhitungan analisa penurunan tanah dan penurunan tiang. Dari hasil analisa didapat nialai fs = 323,33 kN, qn = 187,50 kN, Qult = 509,83 kN, Eg = 0,66, Qg = 35944. Sedangkan untuk penurunan tanah pada kedaman 0-2 m = 0,048 m, 2-3 m = 0,074 m. Perhitungan penurunan tiang tunggal Se = 0,035 m dan penurunan konsolidasi = 0,000001 m. Kata kunci : Tanah lunak, Minipile, Daya dukung tiang, Penurunan tanah
Actions (login required)
View Item |