kristiningsih, (2016) EVALUASI PENJADWALAN DENGAN MENGGUNAKAN METODE CPM (CRITICAL PATH METHOD) DAN EVA (EARNED VALUE ANALYSIS) PADA PROYEK PEKERJAAN REHABILITASI INTAKE BANJIR KANAL BARAT JAKARTA. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1-Hal Cover.pdf Download (537kB) | Preview |
|
|
Text (ABSTRAK)
2-Abstrak.pdf Download (210kB) | Preview |
|
Text (BAB I)
3-Bab 1.pdf Restricted to Registered users only Download (300kB) |
||
Text (BAB II)
4-Bab 2.pdf Restricted to Registered users only Download (241kB) |
||
Text (BAB III)
5-Bab 3.pdf Restricted to Registered users only Download (120kB) |
||
Text (BAB IV)
6-Bab 4.pdf Restricted to Registered users only Download (368kB) |
||
Text (BAB V)
7-Bab 5.pdf Restricted to Registered users only Download (68kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
8-Hal Daftar Pustaka _ Lampiran.pdf Restricted to Registered users only Download (277kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FE/MJ. 16 248 |
NIM/NIDN Creators: | 43113110137 |
Uncontrolled Keywords: | (CRITICAL PATH METHOD) DAN EVA (EARNED VALUE ANALYSIS) PADA PROYEK PEKERJAAN REHABILITASI INTAKE BA |
Divisions: | Fakultas Ekonomi dan Bisnis > Manajemen |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 13 Aug 2016 18:49 |
Last Modified: | 18 Mar 2022 07:41 |
URI: | http://repository.mercubuana.ac.id/id/eprint/4539 |
Actions (login required)
View Item |