Analisis Perbandingan Penggunaan TC Statik Dengan TC Climbing Ditinjau Dari Biaya Dan Waktu Pelaksanaan Instalasi

YAKIN, MUHAMAD AINUL (2016) Analisis Perbandingan Penggunaan TC Statik Dengan TC Climbing Ditinjau Dari Biaya Dan Waktu Pelaksanaan Instalasi. S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (HAL COVER)
1. Cover.pdf

Download (353kB) | Preview
[img]
Preview
Text (ABSTRAK)
2. Abstrak.pdf

Download (70kB) | Preview
[img] Text (BAB I)
3. BAB 1.pdf
Restricted to Registered users only

Download (344kB)
[img] Text (BAB II)
4.BAB 2.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB III)
5. BAB 3.pdf
Restricted to Registered users only

Download (110kB)
[img] Text (BAB IV)
6. BAB 4.pdf
Restricted to Registered users only

Download (2MB)
[img] Text (BAB V)
7. BAB 5.pdf
Restricted to Registered users only

Download (124kB)
[img] Text (DAFTAR PUSTAKA, LAMPIRAN)
8. Daftar Pustaka dan Lampiran.pdf
Restricted to Registered users only

Download (6MB)
Item Type: Thesis (S1)
Call Number CD: FT/SIP. 16 112
NIM/NIDN Creators: 41114120184
Uncontrolled Keywords: Tower Crane, Waktu, Biaya, Proyek MNC Tower, Statil. Climbing, Instalasi, Bangunan Tingkat Tinggi
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Admin Perpus UMB
Date Deposited: 09 Aug 2016 08:11
Last Modified: 04 Aug 2022 07:42
URI: http://repository.mercubuana.ac.id/id/eprint/4456

Actions (login required)

View Item View Item