YAKIN, MUHAMAD AINUL (2016) Analisis Perbandingan Penggunaan TC Statik Dengan TC Climbing Ditinjau Dari Biaya Dan Waktu Pelaksanaan Instalasi. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1. Cover.pdf Download (353kB) | Preview |
|
|
Text (ABSTRAK)
2. Abstrak.pdf Download (70kB) | Preview |
|
Text (BAB I)
3. BAB 1.pdf Restricted to Registered users only Download (344kB) |
||
Text (BAB II)
4.BAB 2.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB III)
5. BAB 3.pdf Restricted to Registered users only Download (110kB) |
||
Text (BAB IV)
6. BAB 4.pdf Restricted to Registered users only Download (2MB) |
||
Text (BAB V)
7. BAB 5.pdf Restricted to Registered users only Download (124kB) |
||
Text (DAFTAR PUSTAKA, LAMPIRAN)
8. Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (6MB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 16 112 |
NIM/NIDN Creators: | 41114120184 |
Uncontrolled Keywords: | Tower Crane, Waktu, Biaya, Proyek MNC Tower, Statil. Climbing, Instalasi, Bangunan Tingkat Tinggi |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 09 Aug 2016 08:11 |
Last Modified: | 04 Aug 2022 07:42 |
URI: | http://repository.mercubuana.ac.id/id/eprint/4456 |
Actions (login required)
View Item |