Astuti, Yulis Septiani (2014) PERANCANGAN PERBAIKAN UNTUK MENURUNKAN LEAD TIME PADA PROSES PEMBUATAN DAMPER TIPE 0,6 DI PT. PRIMATECH PRESISI UTAMA. S1 thesis, Universitas Mercu Buana.
|
Text (Abstrak)
Abstrak.pdf Download (122kB) | Preview |
|
|
Text (Cover)
Cover.pdf Download (1MB) | Preview |
|
Text (Bab 1)
Bab 1.pdf Restricted to Registered users only Download (195kB) |
||
Text (Bab 2)
Bab 2.pdf Restricted to Registered users only Download (758kB) |
||
Text (Bab 3)
Bab 3.pdf Restricted to Registered users only Download (290kB) |
||
Text (Bab 4)
Bab 4.pdf Restricted to Registered users only Download (1MB) |
||
Text (Bab 5)
Bab 5.pdf Restricted to Registered users only Download (463kB) |
||
Text (Bab 6)
Bab 6.pdf Restricted to Registered users only Download (136kB) |
||
Text (Daftar Pustaka dan Lampiran)
Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (96kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 14 112 |
NIM/NIDN Creators: | 416012010059 |
Uncontrolled Keywords: | current state mapping, value added ratio, sistem tarik, future state mapping. |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 07 Apr 2015 15:53 |
Last Modified: | 06 Jul 2017 03:26 |
URI: | http://repository.mercubuana.ac.id/id/eprint/38093 |
Actions (login required)
View Item |