sipayung, anto hasudungan (2007) Analisa kerja dan pengendalian proyek pada pembangunan dan peningkatan busway koridor 7 (koridor kampung ramnutan - kampung melayu). S1 thesis, Universitas Mercu Buana.
Full text not available from this repository.| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | LT.III |
| Call Number: | STSP/07/034 ANT a |
| NIM/NIDN Creators: | 41105110077 |
| Uncontrolled Keywords: | ANALISA KERJA DAN PENGENDALIAN |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 19 Dec 2007 11:44 |
| Last Modified: | 06 Jul 2017 03:19 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/37343 |
Actions (login required)
![]() |
View Item |
