sipayung, anto hasudungan (2007) Analisa kerja dan pengendalian proyek pada pembangunan dan peningkatan busway koridor 7 (koridor kampung ramnutan - kampung melayu). S1 thesis, Universitas Mercu Buana.
Full text not available from this repository.Item Type: | Thesis (S1) |
---|---|
Call Number CD: | LT.III |
Call Number: | STSP/07/034 ANT a |
NIM/NIDN Creators: | 41105110077 |
Uncontrolled Keywords: | ANALISA KERJA DAN PENGENDALIAN |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 19 Dec 2007 11:44 |
Last Modified: | 06 Jul 2017 03:19 |
URI: | http://repository.mercubuana.ac.id/id/eprint/37343 |
Actions (login required)
View Item |