Sandriani, (2005) Proses produksi pembuatan locker dengan menghitung jalur kritis pd bagian pabrikasi. S1 thesis, Universitas Mercu Buana.
Full text not available from this repository.Abstract
Abstraksi kosong
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | Lantai III |
Call Number: | KPTI/05/056 SAN p |
NIM/NIDN Creators: | 01601-027 |
Uncontrolled Keywords: | PROSES PRODUKSI |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 27 Apr 2006 14:33 |
Last Modified: | 21 Jun 2017 03:49 |
URI: | http://repository.mercubuana.ac.id/id/eprint/35734 |
Actions (login required)
View Item |