SUPRIYONO, SUPRIYONO (2011) PENGERJAAN SISTEM INSTALASI FIRE HYDRANT DI PROYEK ISLAMIC CENTER JAKARTA PT. CASA PRIMA INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (KP FULL)
KP FULL.pdf Restricted to Registered users only Download (474kB) |
| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | KP/MSN. 11 003 |
| Call Number: | KP/13/11/039 |
| NIM/NIDN Creators: | 41308110045 |
| Uncontrolled Keywords: | Pengerjaan Sistem Instalasi Fire Hydrant Di Proyek Islamic Center |
| Subjects: | 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 621 Applied Physics/Fisika terapan > 621.8 Machine Engineering, Machinery/Teknik Mesin |
| Divisions: | Fakultas Teknik > Teknik Mesin |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 03 Nov 2011 15:58 |
| Last Modified: | 21 Feb 2026 04:56 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/35448 |
Actions (login required)
![]() |
View Item |
