Penentuan waktu standar proses sewing 1 nfb cara studi waktu di PT Pratama Abadi Industri

Setiawan, Aris (2008) Penentuan waktu standar proses sewing 1 nfb cara studi waktu di PT Pratama Abadi Industri. S1 thesis, Universitas Mercu Buana.

[img] Text (Full Text)
Full Text.pdf
Restricted to Registered users only

Download (0B)
Item Type: Thesis (S1)
Call Number: KPTI/08/105
NIM/NIDN Creators: 4160412-002
Uncontrolled Keywords: standar proses
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Admin Perpus UMB
Date Deposited: 15 Jan 2009 13:08
Last Modified: 13 Jun 2017 04:11
URI: http://repository.mercubuana.ac.id/id/eprint/35428

Actions (login required)

View Item View Item